i. the outturn capital expenditure as outlined in Table 1 and detailed in Annex A is noted.
ii. the carry forward of £21.713m from the 2021/22 capital programme to 2022/23 including those specific schemes listed in Annexe B is approved.
iii. the financing of capital expenditure as shown in Table 3 is noted.
iv. the additional High Needs Provision Capital Allocation grant as noted in para 5.11 is approved.