Agenda item

Application No 21/00780/FUL - Winkfield Manor, Forest Road, Ascot

Demolition of the existing buildings and erection of 18no. residential dwellings utilising the existing access off Forest Road, including parking, landscaping, and ancillary works.

Minutes:

 

Demolition of the existing buildings and erection of 18no. residential dwellings utilising the existing access off Forest Road, including parking, landscaping, and ancillary works.

 

 

The Committee noted:

·       The supplementary report tabled at the meeting.

·       The comments of Winkfield Parish Council as detailed in the agenda

·       The 6 letters of objection received as summarised in the agenda.

 

Following the completion of planning obligation(s) under Section 106 of the Town and Country Planning Act 1990 relating to the following measures:

·       Contribution towards monitoring biodiversity net gain

·       Final SuDS Specification and Management and Maintenance plan to secure management of the SuDS for the lifetime of the development and monitoring sum of £8000 to enable the Council to monitor/inspect SuDS for their lifetime.

 

RECOMMENDED that the Assistant Director: Planning APPROVE the application subject to the following conditions, amended, added to or deleted as the Assistant Director: Planning considers necessary:-

 

01. The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

REASON: To comply with Section 91 of the Town and Country Planning Act 1990 (as amended).

 

02. The development hereby permitted shall be carried out only in accordance with the following approved plans and other submitted details received by the Local Planning Authority:

Location Plan 3698.101 Rev A

Site Plan 3698.101 Rev M

Proposed Plans and Elevations Plots 1- 5 3698.102 Rev C

Proposed Plans and Elevations Plots 6-11 3698.103 Rev B

Proposed Plans and Elevations Plots 12 - 13 3698.104 Rev A

Proposed Plans and Elevations Plot 14 3698. 105 Rev D

Proposed Plans Plots 15 - 18 3698. 106 Rev B

Proposed Elevations Plots 15 - 18 Rev A

Appendix 4 Biodiversity Metric 3.0 73

Planning Committee 16th December 2021

REASON: To ensure that the development is carried out only as approved by the Local Planning Authority.

 

03. No structure hereby permitted shall be built above existing ground level until samples of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The submitted samples shall include the following:

a) Sample panel of all facing materials, including a sample panel(s) of brickwork which demonstrates the brick type, colour, texture, face bond, mortar mix and pointing, to be erected on site and maintained there during the course of construction;

b) Samples and/or manufacturer's details of the roof materials for the works are to be provided on site and retained on site during the course of construction; and

c) Sample of the stone detailing material for the works are to be provided on site and retained on site during the course of construction.

The development shall be carried out in accordance with the approved details.

Reason: In the interests of the visual amenities of the area and to ensure that the development provides an appropriate alternative to the non-designated heritage asset that was originally present on site.

[Relevant Policies: BFBLP EN20, Core Strategy DPD CS7]

 

04. No part of the development hereby permitted shall be begun until details showing the finished floor levels of the dwellings in relation to a fixed datum point in the surrounding area have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details.

REASON: In the interests of the character of the area.

[Relevant Policies: BFBLP EN20, Core Strategy DPD CS7]

 

05. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that order with or without modification), no enlargement or addition permitted by Classes A, B, D and E of Part 1 of the Second Schedule of the 2015 Order shall be carried out to the dwellings hereby permitted.

REASON: The site is located within the Metropolitan Green Belt where strict controls over the form, scale and nature of development are required to maintain the openness of the Green Belt and in order to ensure the long-term protection of adjacent trees.

[Relevant Policies: BFBLP GB1 and EN1, Core Strategy DPD CS7 and CS9]

 

06. Notwithstanding the provisions of Part 1 Class F of the Second Schedule to the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no hard surface shall be provided for any purpose within the curtilage of the dwelling houses.

REASON: In the interests of the health of nearby trees

[Relevant Policies: BFBLP EN1, Core Strategy DPD CS7]

 

07. No part of the development shall be occupied until details of a scheme of walls, fences, gates and any other means of enclosure has been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented in full for each building approved in this permission before its occupation.

REASON: In the interests of the privacy of future occupants and to ensure safeguarding of existing retained trees, hedges and shrubs.

 

08. Notwithstanding the provisions of Part 2 Class A of the Second Schedule to the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking or re-enacting that Order with or without modification), no fences, gates, walls, or other means of enclosure, shall be erected on the site, other than those approved pursuant to Condition 07 of this permission.

REASON: To retain the open character of the development commensurate with its Green Belt character and in the interests of the long-term health of adjoining trees.

[Relevant Policies: BFBLP EN20, Core Strategy DPD CS7]

 

09. No development (including demolition and site clearance) shall take place until details of a scheme (Construction Method Statement) to control the environmental effects of the demolition and/or construction work has been submitted to and approved in writing by the Local Planning Authority. The scheme shall include:-

(i) the control of noise

(ii) the control of dust, smell and other effluvia

(iii) the control of rats and other vermin

(iv) the control of surface water run-off

(v) the proposed method of piling for foundations (if any)

(vi) hours during the construction and demolition phase when delivery vehicles, or vehicles taking materials, are permitted to enter or leave the site.

The development shall be carried out in accordance with the approved scheme.

REASON: In the interests of the amenities of the area.

 

10. No development (including demolition and site clearance) shall take place, until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the local planning authority.

The CEMP shall include as a minimum:

(i) Location of the access for demolition and construction vehicles;

(ii) Routing of construction traffic, including directional signage and appropriate traffic management measures to include the use of banksmen along the access road;

(iii) Details of the parking of vehicles of site operatives and visitors;

(iv) Areas for loading and unloading of plant and materials;

(v) Areas for the storage of plant and materials used in constructing the development;

(vi) Location of any temporary portacabins and welfare buildings for site operatives;

(vii) Details of any security hoarding;

Bracknell Forest Council Planning Committee16th December 2021 Page 7 of 8

(viii) Details of any external lighting of the site;

(ix) Details of the method of piling for foundations;

(x) Measures to control the emission of dust, dirt, noise and odour during construction;

(xi) Measures to control rats and other vermin;

(xii) Measures to control surface water run-off during construction;

(xiii) Measures to prevent ground and water pollution from contaminants on-site;

(xiv) construction and demolition working hours and hours during which delivery vehicles or vehicles taking materials away are allowed to enter or leave the site;

(xv) Details of wheel-washing facilities;

(xvi) Measures to minimise, re-use and re-cycle materials and waste arising from demolition;

(xvii) Measures to minimise the pollution potential of unavoidable waste;

(xviii) Measures to dispose of unavoidable waste in an environmentally acceptable manner;

(xix) details of measures to mitigate the impact of demolition and construction activities on ecology, in particular the protection of any badger sett in or adjacent to the site; and

(x) Details of a monitoring regime to demonstrate compliance with the CEMP including timings for reports to be submitted to the Local Planning Authority.

The approved Construction Environmental Management Plan shall be adhered to throughout the demolition and construction period.

REASON: To mitigate and control environmental effects during the demolition and construction phases

Relevant Policies: BFBLP EN20, EN25; Core Strategy DPD CS1, CS7

 

11. The development hereby permitted (including demolition and site clearance) shall not be begun until a detailed scheme for the protection of existing trees, hedgerows and groups of mature shrubs shown to be retained on the approved drawings, in accordance with British Standard 5837:2012 'Trees in Relation To Construction Recommendations' (or any subsequent revision), has been submitted to and approved in writing by the Local Planning Authority. Details shall include an approved development layout plan at a minimum scale of 1:200 and show the following:-

a) Accurate trunk positions and canopy spreads of all existing trees within the site and on adjoining land adjacent to the development within influencing distance of the development.

b) Positions and spreads of existing hedgerows and groups of mature shrubs.

c) All proposed tree, hedge or shrub removal; shown clearly with a broken line.

d) Proposed locations of protective barriers, that are a minimum height of 2.0 metres and supported by a metal scaffold framework, constructed in accordance with Section 6 (Figure 2) and which include appropriate weatherproof signage (such as "Keep Out - Construction Exclusion Zone") affixed at regular intervals to the outside of the protective fencing structure.

e) Illustrations of the proposed protective barriers to be erected.

f) Proposed location and illustration of ground protection measures within the root protection areas of retained trees, designed as necessary for pedestrian light traffic or heavy plant machinery, as necessary to prevent ground compaction and contamination.

g) Annotations at regular intervals, of the minimum protective distances between barriers and trunks of retained trees.

h) All fenced-off areas clearly annotated as Tree Protection Areas/Construction Exclusion Zones.

i) Notes regarding restrictions which apply to Tree Protection Areas/Construction Exclusion Zones.

Tree protection measures shall be phased as necessary to take into account and provide protection during demolition/site clearance works/building construction works/hard landscaping works.

The development shall be carried out in accordance with the approved scheme and programme.

REASON: In order to safeguard trees and other vegetation considered to be worthy of retention in the interests of the visual amenity of the area.

[Relevant Policies: BFBLP EN1 and EN20, CSDPD CS7]

 

12. No demolition or construction work shall take place outside the hours of 08:00 and 18:00 Monday to Friday; 08:00 and 13:00 Saturday and not at all on Sundays and Public Holidays.

REASON: In the interests of the amenities of the area.

[Relevant Policies: SEP NRM10, BFBLP EN25]

 

13. No structure hereby permitted shall be built above existing ground level until a Sustainability Statement covering water efficiency aimed at achieving an average water use in new dwellings of 110 litres/person/day, has been submitted to, and agreed in writing by, the Local Planning Authority. The development shall be implemented in accordance with the Sustainability Statement, as approved, and retained as such thereafter.

REASON: In the interests of sustainability and the efficient use of resources.

[Relevant Policy: Core Strategy DPD CS10]

14. The development hereby permitted shall be implemented in accordance with the submitted Energy Statement and thereafter the buildings constructed by the carrying out of the development shall be operated in accordance with the submitted Energy Statement.

The renewable energy shall be installed and made operational in accordance with the Energy Statement prior to occupation of the dwellings hereby permitted.

REASON: In the interests of sustainability and the efficient use of resources.

[Relevant Policy: Core Strategy DPD CS12]

 

15. If contamination is found at any time during site clearance, groundwork or construction, the discovery shall be reported as soon as possible to the Local Planning Authority. A full contamination risk assessment shall be carried out and if found to be necessary, a 'remediation method statement' shall be submitted to the Local Planning Authority for written approval. Should no evidence of contamination be found during the development a statement to that effect shall be submitted to the Local Planning Authority.

REASON: To protect future occupiers and users of the site from the harmful effects of contamination

 

16. Works shall be carried out in accordance with the approved 'remediation method statement' (submitted to comply with condition 15) and a final validation report shall be submitted to the Local Planning Authority before the site (or relevant phase of the development site) is occupied.

REASON: To protect future occupiers and users of the site from the harmful effects of contamination

 

17. No development other than demolition shall take place until details of the regrading of the ditch are provided. The approved works shall be implemented as part of the drainage scheme for the site prior to the occupation of any dwelling hereby approved.

REASON: To ensure that the site is properly drained and does not increase the risk of flooding in accordance with policy CS1 of the Core Strategy.

 

18. No development other than demolition shall take place until full details of the Drainage System(s) have been submitted to and approved in writing by the Local Planning Authority. These shall include:

Results of intrusive ground investigations demonstrating the depth of the seasonally high groundwater table.

Full details of all components of the proposed drainage system including dimensions, locations, gradients, invert and cover levels, headwall details, planting (if necessary) and drawings as appropriate taking into account the groundwater table.

Confirmation of the gully spacing calculations to demonstrate that they are capable of conveying the rainfall volumes as set out in the Approved Drainage strategy.

REASON: To ensure that the site is properly drained and does not increase the risk of flooding in accordance with policy CS1 of the Core Strategy.

 

19. No development other than demolition shall take place until a drainage strategy detailing any on- and off-site drainage works, along with proposed points of connection, has been submitted to and approved by the Local Planning Authority in consultation with the sewerage undertaker. No discharge of foul or surface water from the site shall be accepted into the public system until the drainage works referred to in the strategy have been completed and no dwelling hereby permitted shall be occupied until the approved drainage works have been implemented. REASON: To ensure that the site is properly drained and does not increase the risk of flooding in accordance with policy CS1 of the Core Strategy.

 

20. No development other than demolition shall take place until details of how the surface water drainage shall be maintained and managed after completion have been submitted to and approved in writing by the Local Planning Authority. The details shall include confirmation of the required maintenance activities with expected frequency, with site specific assessments included to demonstrate that health and safety has been fully considered in the design and that access and egress for future residents will be maintained during any operations to repair or replace drainage features. The surface water drainage of the site shall be implemented, maintained and managed in accordance with the approved details.

REASON: To ensure that the site is properly drained and does not increase the risk of flooding In accordance with policy CS1 of the Core Strategy.

 

21. No building hereby permitted shall be occupied until the sustainable urban drainage scheme for this site has been completed in accordance with the submitted details. The sustainable urban drainage scheme shall be managed and maintained thereafter in accordance with the agreed management and maintenance plan. Written confirmation of agreements for the management and maintenance of the drainage scheme shall be submitted and approved by the Local Planning Authority.

REASON: To ensure that the site is properly drained and does not increase the risk of flooding in accordance with policy CS1 of the Core Strategy.

 

22. Prior to practical completion of any property a verification report, appended with substantiating evidence demonstrating the agreed/approved construction details and specifications have been implemented, will need to be submitted and approved (in writing) by the Local Planning Authority. This will include photos of excavations and soil profiles/horizons, any placement of tanking, crating, connecting pipe work, hydrobrakes or control mechanisms and cover systems.

Reason: To ensure that the site is properly drained and does not increase the risk of flooding in accordance with policy CS1 of the Core Strategy

 

23. No dwelling hereby permitted shall be occupied until evidence that property owners have been made aware of any SuDS/drainage features within their ownership boundary and their obligations to maintain such features has been submitted to and approved in writing by the Local Planning Authority. Such evidence shall take the form of confirmation of legal covenants associated with the deeds of the properties or similar documentation.

REASON: To ensure that the site is properly drained and does not increase the risk of flooding in accordance with policy CS1 of the Core Strategy.

 

24. The development shall incorporate surface water drainage that is SuDs compliant and in accordance with DEFRA "Sustainable Drainage Systems - Non-statutory technical standards for sustainable drainage systems" (March 2015). It shall be operated and maintained as such thereafter.

REASON: To prevent increased risk of flooding, to improve and protect water quality and ensure future maintenance of the surface water drainage scheme.

[Relevant Policies: CSDPD CS1, BFBLP EN25]

 

25. No dwelling hereby permitted shall be occupied until hard and soft landscaping works have been completed in full accordance with a landscaping scheme that has been submitted to and approved in writing by the Local Planning Authority. The landscaping scheme shall include:-

a) comprehensive planting plans of an appropriate scale and level of detail that provides adequate clarity including details of ground preparation and all other operations associated with plant and grass establishment, full schedules of plants, noting species, and detailed plant sizes/root stock specifications, planting layout, proposed numbers/densities locations; and

b) details of semi mature tree planting; and

c) comprehensive 5 year post planting maintenance schedule; and

d) underground service and external lighting layout (drainage, power, communications cables, pipelines etc. indicating lines, manholes etc.), both existing reused and proposed new routes; and

e) means of enclosure (walls and fences etc); and

f) paving including open spaces, paths, steps and ramps, patios, cycle routes, driveways, parking courts, play areas etc. with details of proposed materials and construction methods; and

g) recycling/refuse or other storage units; and

h) other landscape features (water features, seating, trellis and pergolas etc).

All planting comprised in the soft landscaping works shall be carried out and completed in full accordance with the approved scheme, as a minimum, the quality of all soft landscape works shall be carried out in accordance with British Standard 4428:1989 'Code Of practice For General Landscape Operations' or any subsequent revision. All trees and other plants included within the approved details shall be healthy, well-formed specimens of a minimum quality that is compatible with British Standard 3936:1992 (Part 1) 'Specifications For Trees & Shrubs' and British Standard 4043 (where applicable) or any subsequent revision."

Any trees or other plants which within a period of 5 years from the completion of the development, die, are removed, uprooted, are significantly damaged, become diseased or deformed, shall be replaced during the next planting season (1st October to 31st March inclusive) with others of the same size, species and quality as approved.

REASON: In the interests of good landscape design and the visual amenity of the area.

[Relevant Policies: BFBLP EN2 and EN20, CSDPD CS7]

 

26. No part of the development shall be occupied until details of on-site refuse storage (including any open air storage facilities) for waste material awaiting disposal (including details of any screening) have been submitted to and approved in writing by the Local Planning Authority. Such facilities shall be provided in accordance with the approved details prior to the first occupation of the development and thereafter permanently retained.

REASON: To ensure the provision of satisfactory waste storage facilities in the interests of amenity.

[Relevant Policy: Core Strategy DPD CS13]

 

27. No dwelling shall be occupied until visibility splays of 2.4m x 120m onto Forest Road shown on the approved drawing 8210105/6101 within Appendix I of the Transport Statement have been provided. These areas shall thereafter be kept free of all obstructions to visibility over a height of 0.6 metres measured from the surface of the adjacent carriageway.

REASON: In the interests of highway safety.

[Relevant Policies: Core Strategy DPD CS23]

 

28. No dwelling shall be occupied until that part of the access road which provides access to it and its parking along with the passing bay adjacent to the access road north-east of plot 14 has been constructed in accordance with the approved plans. Thereafter the passing bay adjacent to the access road north-east of plot 14 shown on approved plans shall be kept available for passing of vehicles at all times and no parking or waiting shall be permitted in this passing bay at any time.

REASON: In the interests of highway safety.

[Relevant Policies: Core Strategy DPD CS23]

 

29. No dwelling shall be occupied until the associated vehicle parking and turning space has been surfaced and marked out in accordance with the approved drawing. The spaces and turning space shall thereafter be kept available for parking and turning at all times.

REASON: To ensure that the development is provided with adequate car parking to prevent the likelihood of inconsiderate or obstructive parking within the development which would be a danger to other road users.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

30. No development shall take place until details of consultation and agreement with the fire service including inter alia about fire appliance access and in relation to sections of the access road which are narrower than 3.7m in width has been submitted to and approved in writing by the Local Planning Authority. The approved access arrangements for fire appliances shall thereafter be retained.

REASON: To allow safe and suitable access by service and emergency vehicles.

[Relevant Policies: NPPF paragraphs 110 b) and 112 d)]

 

31. The garage accommodation for plot 14 shall:

(a) have garage doors which are of a roller shutter design. Any replacement or repair shall only be with a roller shutter type garage door.

(b) be retained for the use of the parking of at least one vehicle and for cycle parking at all times,.

REASON: To ensure that the development is provided with adequate car parking to prevent the likelihood of inconsiderate or obstructive parking within the development which would be a danger to other road users and to ensure that the garage is still accessible while a car is parked to the front of the property avoiding inappropriately parked cars comprising the access road.

[Relevant Policy: BFBLP M9]

 

32. No development above slab level shall take place until a scheme has been submitted to and approved in writing by the Local Planning Authority for covered and secure cycle parking facilities with at least one secure covered cycle space per bedroom for each property. No dwelling shall be occupied until the approved cycle parking for that dwelling has been implemented. The approved facilities shall be retained.

REASON: In the interests of accessibility of the development to cyclists.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

33. Any gates provided shall open away from the adopted highway and be set back a distance of at least 6.0 metres from the edge of the carriageway of the adjoining highway of Forest Road.

REASON: In the interests of highway safety.

[Relevant Policies: Core Strategy DPD CS23]

 

34. No dwelling shall be occupied until off-site highway works comprising an uncontrolled crossing point with tactile paving and footway return for pedestrians to access bus stops on Forest Road has been constructed in accordance with drawing 8210105/6102 within Appendix K of the Transport Statement and in accordance with details which have been submitted to and approved in writing by the Local Planning Authority.

REASON: In the interests of accessibility and to facilitate access by pedestrians to public transport.

[Relevant Policies: BFBLP M6 and M8, Core Strategy DPD CS23 and CS24]

 

35. No development shall take place until a programme of archaeological work (which may comprise more than one phase of works) has been implemented in accordance with a written scheme of investigation, which has been submitted by the applicant and approved by the Local Planning Authority. The development shall only take place in accordance with the detailed scheme approved pursuant to this condition.

REASON: The site lies within an area of unknown archaeological potential. The condition will ensure that any archaeological remains within the site are adequately investigated and recorded in order to advance our understanding of the significance of any buried remains to be lost and in the interest of protecting the archaeological heritage of the Borough.

 

36. A landscape and ecological management plan (LEMP) shall be submitted to, and approved in writing by, the Local Planning Authority prior to the practical completion of the development. The content of the LEMP shall include the following:

a) Description and evaluation of features to be managed

b) Ecological trends and constraints on site that might influence management

c) Aims and objectives of management

d) Appropriate management options for achieving aims and objectives

e) Prescriptions for management actions

f) Preparation of a work schedule (including an annual work plan capable of being rolled forward over a five-year period)

g) Details of the body or organization responsible for implementation of the plan

h) On-going monitoring and remedial measures

The LEMP shall also include details of the legal and funding mechanism(s) by which the long-term implementation of the plan will be secured by the developer with the management bodies responsible for its delivery. The plan shall also set out (where the results from monitoring show that conservation aims and objectives of the LEMP are not being met) how contingencies and/or remedial action will be identified, agreed and implemented so that the development still delivers the fully functioning biodiversity objectives of the originally approved scheme.

The approved plan will be implemented in accordance with the approved details.

REASON: In the interests of nature conservation

[Relevant Plans and Policies: CSDPD CS1]

 

37. No development shall commence until a scheme for the provision of biodiversity enhancements (not mitigation), including a plan or drawing showing the location of these enhancements, has been submitted to and approved in writing by the Local Planning Authority. An ecological site inspection report confirming the implementation of the approved enhancements shall be submitted within three months of the first occupation of the first dwelling hereby approved.

The approved scheme shall be performed, observed and complied with.

REASON: In the interests of nature conservation

[Relevant Plans and Policies: CSDPD CS1, CS7]

 

38. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) or any Order revoking and re-enacting that order, no external lighting shall be installed on the site or affixed to any buildings on the site except in accordance with details set out in a lighting design strategy for biodiversity that has first been submitted to and approved in writing by the Local Planning Authority. The strategy shall:

a) identify those area/features on site that are particularly sensitive for bats and that are likely to cause disturbance in or around their breeding sites and resting places or along important routes used to access key areas of their territory, for example, for foraging; and

b) show how and where external lighting will be installed (through the provision of appropriate lighting contour plans with vertical calculation planes and technical specifications) so that it can be clearly demonstrated that areas to be lit will not disturb or prevent bats using their territory or having access to their breeding sites and resting places.

All external lighting shall be installed in accordance with the specifications and locations set out in the strategy, and these shall be maintained thereafter in accordance with the strategy. Under no circumstances should any other external lighting be installed.

REASON: In the interests of nature conservation

 

39. If more than 2 years elapse between the previous badger survey and the commencement of the development, an updated survey shall be carried out by a suitably qualified ecologist. A report confirming the results and implications of the assessment, including any revised mitigation measures, shall be submitted to the Local Planning Authority before construction works commence on site.

REASON: In the interests of minimizing the impact of development on biodiversity.

 

40. No development other than demolition shall take place until details of the locations and infrastructure which will be provided to enable at least 20% (1 in 5) of all residential and visitor parking spaces to be readily adaptable to provide electric vehicle charging points have been submitted to and approved in writing by the Local Planning Authority. No dwelling hereby permitted shall be occupied until the electric vehicle enabling infrastructure has been provided in accordance with the approved details. The electric vehicle enabling infrastructure shall thereafter be retained.

REASON: To ensure that the development is provided with adequate access to electric vehicle charging infrastructure in the interests of sustainability.

Supporting documents: