Agenda item

21/00217/FUL Land At Formerly The Mango Tree, 63 Church Street, Crowthorne

Construction of a replacement building to provide 8 No. residential flats with ancillary car parking and landscaping.

Minutes:

Construction of a replacement building to provide 8 No. residential flats with ancillary car parking and landscaping.

 

The Committee noted:

·       The supplementary report tabled at the meeting.

·       The comments of Crowthorne Parish Council recommending approval to the proposal as detailed in the agenda.

·       The 12 letters of objection received as summarised in the agenda.

·       The 1 letter which neither supported nor objected to the proposal, as detailed in the agenda.

 

Following the completion of planning obligation(s) under Section 106 of the Town and Country Planning Act 1990 relating to:

 

- Measures to avoid and mitigate the impact of residential development upon the Thames Basins Heath SPA.

- Requirement to enter into S278 for the construction of the access.

 

RECOMMENDED that the Assistant Director: Planning APPROVE the application subject to the following conditions amended, added to or deleted as the Assistant Director: Planning considers necessary: -

 

01. The use hereby permitted shall be begun before the expiration of three years from the date of this permission.

REASON: To comply with Section 91 of the Town and Country Planning Act 1990. 49

Planning Committee 14th October 2021

 

02. The development hereby permitted shall be carried out only in accordance with the following approved plans and other submitted details: -

791.050F Proposed Site Plan

953.022M Proposed Site Plan

953.020G Proposed Elevations

953.021H Proposed Floor Plans

953.024B Proposed Street Scene

REASON: To ensure that the development is carried out only as approved by the Local Planning Authority.

 

03. The following, shall be submitted to and approved in writing by the Local Planning Authority before the relevant part of the work is begun:

 

a) Sample panel of all facing materials, including previously retained bricks to be used under 17/01273/FUL and a sample panel(s) of brickwork which demonstrates the brick type, colour, texture, face bond, mortar mix and pointing, to be erected on site and maintained there during the course of construction;

b) Samples and/or manufacturer's details of the roof materials for the proposed works,

c) Plan and elevation, with materials annotated, of all new window openings (showing brick gauged headers);

d). Plan and elevation drawings, with materials annotated, of all new doors at a minimum scale of 1:10 with typical moulding and architrave;

The relevant part of the works shall not be carried out otherwise than in accordance with the approved details.

REASON: In order to safeguard the appearance of a building in a Conservation Area in accordance with the requirements of policy.

[Relevant Policies: BFBLP EN20 and Core Strategy DPD CS1]

 

04. The following, shall be submitted to and approved in writing by the Local Planning Authority before the relevant part of the work is begun:

 

• schedule of materials and finishes for the hard landscaping including car parking and access road surfaces.

All work shall be carried out in full accordance with the approved document(s).

REASON: In order to safeguard the appearance of the site in a Conservation Area in accordance with the requirements of policy.

[Relevant Policies: BFBLP EN20 and Core Strategy DPD CS1]

 

05. No development (other than the construction of the access) shall take place until the access onto Church Street has been constructed in accordance with the details to be submitted to and approved in writing by the Local Planning Authority.

REASON: In the interests of highway safety.

[Relevant Policies: Core Strategy DPD CS23]

 

06. No dwelling shall be occupied until the access road between the adopted highway of Church Street and the car parking and turning area including provision for both vehicles and pedestrians has been constructed in a bound or bonded material in accordance with the approved plans.

REASON: In the interests of highway safety.

[Relevant Policies: Core Strategy DPD CS23]

 

07. No dwelling shall be occupied until the associated vehicle parking and turning space for 17 cars to park and turn has been surfaced and marked out in accordance with the approved drawing. The spaces shall thereafter be kept available for parking at all times.

 REASON: To ensure that the development is provided with adequate car parking to prevent the likelihood of on-street car parking which would be a danger to other road users.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23

 

08. The development shall not be occupied until (a) details of the location of 1 visitor car parking space, and (b) details of the signing for the visitor space have been submitted to and approved in writing by the Local Planning Authority. The car parking space shall be provided and signed in accordance with the approved details and the space and signage shall thereafter be retained.

REASON: To ensure that the development is provided with adequate car parking to prevent the likelihood of on-street car parking which would be a danger to other road users.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

09. The development shall not be occupied until 16 secure and covered cycle parking spaces have been provided in the location identified for cycle parking on the approved plans within the development. The cycle parking spaces and facilities shall thereafter be retained.

REASON: In the interests of accessibility of the development to cyclists.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

10. No development shall take place until a Construction Transport Management Plan has been submitted to and approved in writing by the Planning Authority to include:

(a) Details of parking for contractors and visitors;

(b) Details of areas for storage of plant and materials;

(c) Details of areas for welfare and associated cabins;

(d) Details of wheel wash to be provided to avoid deposition of material on the highway; and

(e) Swept path drawings indicating that the largest anticipated construction vehicle can turn around within the site and leave in a forward gear onto Church Road.

The approved Construction Transport Management Plan shall be adhered to throughout the demolition and construction period.

REASON: To mitigate and control environmental effects during the demolition and construction phases and in the interests of highway safety.

[Relevant Policies: BFBLP EN20, EN25; Core Strategy DPD CS1, CS7, CS23]

 

11. No development [including demolition and site clearance] shall take place until a Construction Environmental Management Plan (CEMP) to control the environmental effects of the demolition and construction work has been submitted to and approved in writing by the Local Planning Authority. The CEMP shall include measures for: the control of dust, odour and other effluvia

- the control of noise (including noise from any piling and permitted working hours)

- the control of pests and other vermin (particularly during site clearance)

- the control of surface water run-off)

- The control of noise from delivery vehicles, and times when deliveries are accepted and when materials can be removed from the site

- The control of waste from the site so that NO BURNING will commence.

Construction activity shall be carried out in accordance with the approved CEMP.

REASON: In the interests of the amenities of the area.

[Relevant Policies: BFBLP EN25]

 

12. During the construction of the development hereby approved the Arboricultural Method Statement Addendum and Tree Protection Plan produced by ATS dated June 2021 shall be complied with in full.

REASON: In order to safeguard trees and other vegetation considered to be worthy of retention.

[Relevant Policies: BFBLP EN1 and EN20, CSDPD CS7]

 

13. The following window(s) in the development hereby permitted or any replacement window shall not be glazed at any time other than with a minimum of Pilkington Level 3 obscure glass (or equivalent). They shall at all times be non-opening unless the parts of the window which can be opened are more than 1.7 metres above the floor of the room in which the window is installed.

- Flat 4 - first floor bedroom window south-eastern (side) elevation

- Flat 5 - 2 x first floor bedroom windows south-eastern (side) elevation

- Flats 7 and 8 - dormer windows south-eastern (side) elevation

- Flat 1 - ground floor living room window south-eastern (side) elevation

REASON: To prevent the overlooking of neighbouring properties.

[Relevant Policies: BFBLP EN20]

 

14. The Technical Briefing Note, Addendum Bat Roost Assessment Report, dated Dec 2020 produced by aspect ecology, shall be complied with in full during the development.

REASON: In the interests of biodiversity.

[Relevant Plans and Policies: BFBLP EN3 CS1, CS7]

 

15. No dwelling shall be occupied until comprehensive details of both hard and soft landscaping works have been submitted to and approved in writing by the Local Planning Authority. These details shall include: -

a) Comprehensive planting plans of an appropriate scale and level of detail that provides adequate clarity including details of ground preparation and all other operations associated with plant and grass establishment, full schedules of plants, noting species, and detailed plant sizes/root stock specifications, planting layout to include the retention of the hedge on the north western boundary, proposed numbers/densities locations.

b) Comprehensive 5 year post planting maintenance schedule.

c) Paving including paths, patios, proposed materials and construction methods, parking courts, etc.

d) Location, site specific design (including foundation requirements), and implementation method statement for permanent low barriers to prevent vehicle parking access onto retained soft landscaping areas forming part of the Root Protection areas of protected trees affecting the site.

All planting comprised in the soft landscaping works shall be carried out and completed in full accordance with the approved scheme, in the nearest planting season (1st October to 31st March inclusive) to the completion of the development or prior to the occupation of any part of the approved development, whichever is sooner. All hard landscaping works shall be carried and completed prior to the occupation of any part of the approved development. As a minimum, the quality of all hard and soft landscape works shall be carried out in accordance with British Standard BS 8545:2014 - Trees: from nursery to independence in the landscape - Recommendations or any subsequent revision. All trees and other plants included within the approved details shall be healthy, well-formed specimens of a minimum quality that is compatible with British Standard 3936:1992 (Part 1) 'Specifications for Trees & Shrubs' and British Standard 4043 (where applicable) or any subsequent revision. Any trees or other plants which within a period of 5 years from the completion of the development, die, are removed, uprooted, are significantly damaged, become diseased or deformed, shall be replaced during the nearest planting season (1st October to 31st March inclusive) with others of the same size, species and quality as approved. The areas shown for soft landscaping purposes on the approved plans shall thereafter be retained as such and shall not be used for any other purpose

REASON: In the interests of the visual amenities of the area.

[Relevant Plans and Policies: BFBLP EN20, CSDPD CS7]

 

16. No development shall take place until full details of the Drainage System has been submitted to and approved in writing by the Local Planning Authority in accordance with the approved drawings (GTA submission dated 21st July 21) These shall include:

full details of all components of the proposed drainage system including dimensions, permeable paving construction, locations, gradients, invert and cover levels, headwall details, planting (if necessary) and drawings as appropriate taking into account the groundwater table.The agreed details shall be fully implemented within the development.

REASON: To ensure that the site is properly drained and does not increase the risk of flooding in accordance with policy CS1 of the Core Strategy.

 

17. No dwelling shall be occupied until details of how the surface water drainage shall be maintained and managed after completion have been submitted to and approved in writing by the Local Planning Authority. The details shall include confirmation of the required maintenance activities with expected frequency, with site specific assessments included to demonstrate that health and safety has been fully considered in the design and that access and egress for future residents will be maintained during any operations to repair or replace drainage features.

REASON: To ensure that the site is properly drained and does not

increase the risk of flooding in accordance with policy CS1 of the Core Strategy.

 

18. No dwelling shall be occupied until the sustainable urban drainage scheme for this site has been completed in accordance with the submitted details. The sustainable urban drainage scheme shall be managed and maintained thereafter in accordance with the agreed management and maintenance plan. Written confirmation of agreements for the management and maintenance of the drainage scheme shall be submitted and approved by the local planning authority.

REASON: To ensure that the site is properly drained and does not increase the risk of flooding in accordance with policy CS1 of the Core Strategy.

 

19. Prior to practical completion of any property a verification report, appended with substantiating evidence demonstrating the agreed/approved construction details and specifications have been implemented, will need to be submitted and approved (in writing) by the Council. This will include photos of excavations and soil profiles/horizons, any placement of tanking, crating, connecting pipe work, aquacludes or aquabrakes, cover systems.

Reason: To ensure that the site is properly drained and does not increase the risk of flooding in accordance with policy CS1 of the Core Strategy.

 

20. The development hereby permitted shall not be begun until an Energy Demand Assessment demonstrating that:

(a) the proposed development will reduce carbon dioxide emissions by at least 10% against the appropriate Target Emission Rate as set out in Part L of the Building Regulations (2006), and

(b) a proportion of the development’s energy requirements will be provided from on-site renewable energy production (which proportion shall be 20%)

has been submitted to and approved in writing by the Local Planning Authority. The building shall thereafter be constructed in accordance with the approved assessment and retained as such thereafter.

REASON: In the interests of the sustainability and the efficient use of resources.

[Relevant Plans and Policies: CSDPD CS12]

 

21. The development shall not be begun until a Sustainability Statement covering water efficiency aimed at achieving an average water use in new dwellings of 110 litres/ person/day, has been submitted to, and agreed in writing by, the Local Planning Authority. The development shall be implemented in accordance with the Sustainability Statement, as approved, and retained as such thereafter.

REASON: In the interests of sustainability and the efficient use of resources.

[Relevant Policy: Core Strategy DPD CS10]

 

22. No dwelling shall be occupied until details of boundary treatments have been submitted to and approved in writing by the Local Planning Authority. All boundary treatments should provide for the free movement of wildlife to and from the site. The approved scheme shall be implemented in full before the occupation of any of the flats approved in this permission.

REASON: In the interests of the visual amenities of the area and in the interests of biodiversity.

[Relevant Plans and Policies: BFBLP EN20, CSDPD CS1, CS7]

 

23. The rooflight in Flat 7 on the south-eastern (side) elevation or any replacement rooflight shall be set more than 1.7 metres above the floor of the room in which the roof light is installed.

REASON: To prevent the overlooking of neighbouring properties.

[Relevant Policies: BFBLP EN20]

24. No part of the development shall be occupied until details of on-site refuse storage for waste material awaiting disposal (including details of any screening) have been submitted to and approved in writing by the Local Planning Authority. Such facilities shall be provided in accordance with the approved details prior to the first occupation of the development and thereafter permanently retained.

REASON: To ensure the provision of satisfactory waste storage facilities in the interests of amenity.

[Relevant Policy: Relevant Policy: Core Strategy DPD CS13]

 

In the event of the S106 agreement not being completed by 14th January 2022, the Assistant Director: Planning be authorised to either extend the period further or refuse the application for the following reasons: -

 

01 In the absence of a planning obligation to secure suitable avoidance and mitigation measures and access management monitoring arrangements, in terms that are satisfactory to the Local Planning Authority, the proposal would be contrary to Regulation 63(5) of the Conservation of Habitats and Species Regulations 2017 (as amended), Policy NRM6 of the South East Plan, Policy EN3 of the Bracknell Forest Borough Local Plan, Policy CS14 of the Core Strategy Development Plan Document and the Thames Basin Heaths Special Protection Area Supplementary Planning Document (2018).