Agenda item

Application No 19/00327/FUL - Land At South West Of Abbey Place, Abbey Place, Warfield

Erection of 9 dwellings with associated access, parking and landscaping.

Minutes:

Erection of 9 dwellings with associated access, parking and landscaping.

 

The Committee noted:

·        Warfield Parish Councils comments, objecting to the proposal as detailed in the agenda papers

·        A total of 5 objections from neighbouring properties as summarised in the

agenda papers.

·        The supplementary papers tabled at the meeting

·        The additional representations received from a neighbour who had already objected to the development as detailed in the supplementary papers.

 

Following the completion of planning obligations secured by an agreement, under Section 106 of the Town and Country Planning Act 1990, relating to:

 

- The construction of affordable housing and an off-site contribution towards affordable housing.

- The construction of the pedestrian and cycle access within the site, and a financial

contribution for the delivery of the section within the Redrow site to the west.

- A permissive right through the development by foot or bicycle.

- A contribution towards the ICT fit out of the Warfield West Primary School

- A financial contribution towards the Warfield Community Hub and new Neighbourhood Centre.

- A financial contribution for off-site open space provision to be used towards Priory Fields and/or the Warfield Memorial Ground Playing Field.

- The provision and long-term maintenance of sustainable drainage (SuDs).

Planning Committee 10th September 2020

- The Thames Basins Heaths SPA mitigation – Suitable Alternative Natural Greenspace (SANG) and contribution towards Strategic Access Management and Monitoring (SAMM).

 

RESOLVED that the Head of Planning be authorised to APPROVE the application subject to the following conditions amended, added to or deleted as the Head of Planning considers necessary and following the required consultation with the applicant in relation to pre-commencement conditions: -

 

01. The development hereby permitted shall be begun before the expiration of three years from

the date of this permission.

REASON: To comply with Section 91 of the Town and Country Planning Act 1990 (as

amended).

 

2. The development hereby permitted shall be carried out only in accordance with the following approved plans received by the Local Planning Authority:

Block Plan AP-BP- 01

Site Layout AB-SL_9U-01C - Rec. 26.5.2020

Site Layout Coloured - AB-CSL_9U- 01 - Rec. 12.6.2020

Plot 1 - Plans and Elevations AB-PE_9U - 01 - Rec. 7.8.2020

Plot 2 - Plans and Elevations AB-PE_9U - 02 - Rec. 7.8.2020

Plot 3 - Plans and Elevations AB-PE_9U - 03 - Rec. 7.8.2020

Plots 4-9 - Plans and Elevations AB-PE_9U - 04A - Rec 12.6.2020

Streetscene - AB-SS - 01- 02 - Rec. 7.8.2020

Drainage Strategy C200 Rev 5 - Rec. 3. 8. 2020

Existing Ditch Engineering works BR- 533-0037 C203A - Rec. 29.1.2020

Flood Risk Assessment Calibro Report Ref BR-537-0037 Rev 02 - Rec 3.2.2020

Tree Protection Plan TMC - 13075 - L/C - Rec. 11.5.2020

Tree Survey and Constraints Plan TMC - 13075 - S/C - Rec 11.5.2020

Arboricultural Impact Statement 13075- AIA - C - Rec.11.5.2020

Phase 1 Geo Environmental Risk Assessment - Rec 8.4.2019

Sustainability Statement - Rec 30.4.2020

REASON: To ensure that the development is carried out only as approved by the Local Planning Authority.

 

03. No structure hereby permitted shall be built above existing ground level until samples of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details.

REASON: In the interests of the visual amenities of the area.

[Relevant Policies: BFBLP EN20, Core Strategy DPD CS7]

 

04. No part of the development hereby permitted shall be begun until details showing the finished floor levels of the building/s in relation to a fixed datum point has been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details.

REASON: In the interests of the character of the area and to protect the amenities of

neighbouring properties.

[Relevant Policies: BFBLP EN20, Core Strategy DPD CS7]

 

05. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any Order revoking and re-enacting that Order with or without modification) no additional windows shall be constructed at first floor level or above in the side elevations of the dwellings hereby permitted other than as shown on the approved drawings.

REASON: To prevent the overlooking of neighbouring property.

[Relevant Policies: BFBLP EN20]

 

06. The following window(s) in the development hereby permitted or any replacement window shall not be glazed at any time other than with a minimum of Pilkington Level 3 obscure glass (or equivalent). They shall at all times be non-opening unless the parts of the window which can be opened are more than 1.7 metres above the floor of the room in which the window is installed.

Plot 1 - ground floor (west elevation) lounge

Plot 2 – ground floor (east elevation) lounge

REASON: To prevent the overlooking of neighbouring property.

[Relevant Policies: BFBLP EN20]

 

07. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that order with or without modification), no enlargement, addition, improvement or other alteration permitted by Classes [A, B, C, and E] of Part 1 of the Second Schedule of the 2015 Order shall be carried out to the dwellings hereby permitted.

REASON: To safeguard the character of the area and the amenities of adjoining properties.

[Relevant Policies: BFBLP EN20]

 

08. The development shall not be begun until a scheme depicting hard and soft landscaping has been submitted to and approved in writing by the Local Planning Authority. The scheme shall include a 3 year post planting maintenance schedule.

All planting comprised in the soft landscaping works shall be carried out and completed in full accordance with the approved scheme, in the nearest planting season (1st October to 31st March inclusive) to the completion of the development or prior to the occupation of any part of the approved development, whichever is sooner. All hard landscaping works shall be carried out and completed prior to the occupation of any part of the approved development. As a minimum, the quality of all hard and soft landscape works shall be carried out in accordance with British Standard 4428:1989 'Code Of practice For General Landscape Operations' or any

subsequent revision. All trees and other plants included within the approved details shall be healthy, well formed specimens of a minimum quality that is compatible with British Standard 3936:1992 (Part 1) 'Specifications For Trees & Shrubs' and British Standard 4043 (where applicable) or any subsequent revision. Any trees or other plants which within a period of 5 years from the completion of the development, die, are removed, uprooted, are significantly damaged, become diseased or deformed, shall be replaced during the nearest planting season (1st October to 31st March inclusive) with others of the same size, species and quality as approved.

REASON: In the interests of nature conservation

[Relevant Plans and Policies: CSDPD CS1, CS7]

 

09. No development shall commence until details of boundary treatments (fencing, hedges, walls) have been submitted to and approved by the Local Planning Authority. No dwelling shall be occupied until its associated boundary treatments have been provided in accordance with the approved details.

REASON: In the interests of the appearance of the site

[Relevant Plans and Policies: BFBLP EN20, CSDPD CS7]

 

10. No retained tree, hedgerow or group of shrubs specified as to be retained on the approved drawings shall be cut down, uprooted or destroyed.

Any trees, hedgerows or groups of shrubs shown to be retained on the approved plans which die, are removed or irreparably damaged during the course of the development, or within a period of 5 years of the completion of the development, shall be replaced with another tree, hedgerow or group of shrubs of the same species and size as that originally planted.

REASON: In order to safeguard trees and other vegetation considered to be worthy of retention in the interests of the visual amenity of the area.

[Relevant Policies: BFBLP EN1 and EN20, CSDPD CS7]

 

11. All existing trees, hedgerows and groups of trees shown to be retained on the approved drawings shall be protected during the course of building works by 2m high (minimum) welded mesh panels, supported be a metal scaffold framework, constructed in accordance with Section 6.2 of British Standard 5837:2012 or any subsequent revision. The development shall be carried out in accordance with the approved drawings.

REASON: In order to safeguard trees and other vegetation considered to be worthy of retention in the interests of the visual amenity of the area.

[Relevant Policies: BFBLP EN1 and EN20, CSDPD CS7]

 

12. No demolition shall be begun until a scheme for the provision of biodiversity enhancements (not mitigation), including a plan or drawing showing the location of these enhancements, has been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be performed, observed and complied with and retained as such thereafter.

REASON: In the interests of nature conservation

[Relevant Plans and Policies: CSDPD CS1, CS7]

 

13. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) or any Order revoking and re-enacting that order, no external lighting shall be installed on the site or affixed to any buildings on the site except in accordance with details set out in a lighting design strategy for biodiversity that has first been submitted to and approved in writing by the Local Planning Authority. The strategy shall:

a) identify those area/features on site that are particularly sensitive for bats and that are likely to cause disturbance in or around their breeding sites and resting places or along important routes used to access key areas of their territory, for example, for foraging; and

b) show how and where external lighting will be installed (through the provision of appropriate lighting contour plans and technical specifications) so that it can be clearly demonstrated that areas to be lit will not disturb or prevent bats using their territory or having access to their breeding sites and resting places.

All external lighting shall be installed in accordance with the specifications and locations set out in the strategy, and these shall be maintained thereafter in accordance with the strategy.

Under no circumstances should any other external lighting be installed.

REASON: In the interest of protecting bio-diversity.

[Relevant Policies: BFBLP EN2, Core Strategy DPD CS1]

 

14.The development hereby permitted shall be implemented in accordance with the submitted Sustainability Statement and shall be retained in accordance therewith.

REASON: In the interests of sustainability and the efficient use of resources.

[Relevant Policy: Core Strategy DPD CS10]

 

15. No development shall commence until the details of the design, specification and location of the Solar PV as detailed in the Sustainability Statement have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be implemented in full accordance with the approved details and retained as such thereafter.

REASON: In the interests of sustainability and the efficient use of resources.

[Relevant Policy: CSDPD CS10]

 

16. No development shall commence until details of the specification for the construction of the pedestrian and cycle link connecting the highway and the western boundary of the site as illustrated on drawing AB_SL_9U-01C shall have been submitted to and approved in writing by the Local Planning Authority. No dwelling within the development hereby approved shall be occupied until the pedestrian and cycle link to the western boundary of the site has been constructed in accordance with the approved details.

REASON: In the interests of accessibility and to facilitate access by cyclists and/or

pedestrians.

[Relevant Policies: BFBLP M6, Core Strategy DPD CS23]

 

17. No development shall take place until a plan showing visibility splays at the junction of the turning head and the car parking area to the rear of plots 4 – 9 has been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. The visibility splays shall thereafter be kept free of all obstructions to visibility over a height of 0.6 metres measured from the surface of the adjacent

carriageway.

REASON: In the interests of highway safety.

[Relevant Policies: Core Strategy DPD CS23]

 

18. No dwelling shall be occupied until that part of the access road which provides access to it, along with adjacent margins and street lighting placed within these margins, has been constructed to an adoptable standard in accordance with details which have been submitted to an approved in writing by the Local Planning Authority. The development shall thereafter be constructed in accordance with the approved details

REASON: In the interests of highway safety.

[Relevant Policies: Core Strategy DPD CS23]

 

19. No dwelling shall be occupied until the associated vehicle parking and turning space has been surfaced and marked out in accordance with the approved drawing. The spaces shall thereafter be kept available for parking at all times.

REASON: To ensure that the development is provided with adequate car parking to prevent

the likelihood of on-street car parking which would be a danger to other road users.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

20. No development shall commence until:

(a) details of the location of 2 visitor car parking spaces, and

(b) details of the signing for the visitor car parking spaces have been submitted to and approved in writing by the Local Planning Authority. The visitor car parking spaces shall be provided and signed in accordance with the approved details before the occupation of any of the dwellings hereby approved and the spaces and signage shall thereafter be retained.

REASON: To ensure that the development is provided with adequate car parking to prevent  the likelihood of on-street car parking which would be a danger to other road users.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

21. The garage accommodation for plot 3 shall be retained for the use of the parking of vehicles at all times.

REASON: To ensure that the Local Planning Authority's vehicle parking standards are met.

[Relevant Policy: BFBLP M9]

 

22. No development shall take place until a scheme has been submitted to and

approved in writing by the Local Planning Authority for covered and secure cycle parking facilities. No dwelling shall be occupied until the approved scheme has been implemented and the facilities shall be retained as such thereafter.

REASON: In the interests of accessibility of the development to cyclists.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

23. No gates shall be provided at the vehicular access to the site.

REASON: In the interests of highway safety.

Relevant Policies: Core Strategy DPD CS23]

 

24. No development (including demolition and site clearance) shall take place, until a

Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the local planning authority. The CEMP shall include as a minimum;

(i) Routing of construction traffic (including directional signage and appropriate traffic

management measures);

(ii) Details of the parking of vehicles of site operatives and visitors;

(iii) Areas for loading and unloading of plant and materials;

(iv) Areas for the storage of plant and materials used in constructing the development;

(v) Location of any temporary portacabins and welfare buildings for site operatives;

(vi) Details of any security hoarding;

(vii) Details of any external lighting of the site;

(viii) Details of the method of piling for foundations;

(ix) Measures to control the emission of dust, dirt, noise and odour during construction;

(x) Measures to control surface water run-off during construction;

(xi) construction and demolition working hours and hours during which delivery vehicles or vehicles taking materials away are allowed to enter or leave the site;

(xii) Details of wheel-washing facilities; and

(xiii) Areas for the turning of construction vehicles such that the largest anticipated vehicle can turn and leave the site in a forward gear.

The approved Construction Environmental Management Plan shall be adhered to throughout the demolition and construction period.

REASON: In the interests of highway safety and to mitigate and control environmental effects during the demolition and construction phases.

[Relevant Policies: BFBLP EN20, EN25, M9; Core Strategy DPD CS1, CS7, CS23]

 

25. Should any unforeseen contamination be encountered during the development, the local planning authority shall be informed immediately. Any further investigation/remedial/protective works shall be carried out to agreed timescales and approved by the local planning authority in writing. A Site Completion Report shall be submitted to, and approved in writing by, the local planning authority. The report must detail the conclusions, actions taken and verification methodology at each stage of the works and shall include a sampling and analysis programme to confirm the adequacy of decontamination. An appropriately qualified person shall oversee the implementation of all remediation. The construction of buildings shall not commence until the investigator has provided a report, which shall include confirmation that all

remediation measures have been carried out fully in accordance with the remediation scheme. The report shall also include results of the verification programme of post-remediation sampling and monitoring in order to demonstrate that the required remediation has been fully met. Future monitoring proposals and reporting shall also be detailed in the report. This must be conducted in accordance with DEFRA and the Environment Agency’s “Model Procedures for the Management of Land Contamination, CLR 11”.

REASON: The proposed development is located on a potentially contaminated site, due to its historic land use. To ensure the development is suitable for its end use and the wider environment and does not create undue risks to occupiers of the site or surrounding areas.

[Relevant Policies: BFBLP EN25}

 

26. No development shall commence until:

i) the exploratory archaeological work as set out in the 'Project specification for an

archaeological evaluation' (dated 5th June 2018, ref. 14e218ev) has been implemented;

ii) a further programme of archaeological mitigation has been submitted to and agreed in

writing with the Local Planning Authority should the results of the exploratory investigation justify it. The further programme shall be implemented in accordance with the approved details.

REASON: The site lies in an area of archaeological potential, particularly for prehistoric and Roman remains. The potential impacts on the buried archaeological heritage can be mitigated by a programme of archaeological work so as to record and advance understanding of any heritage assets to be lost in accordance with national and local planning policy.

[Relevant Policies: BFBLP EN20, EN25, M9; Core Strategy DPD CS1, CS7, CS23]

 

27. No development shall commence until full details of the Drainage System(s) in accordance with the Calibro Report Ref BR-537-0037 Rev 02 with updated Drainage Strategy drawing (T4C drawing no. C200 Rev.5) provided by Josh Blackall's email dated 3rd August 2020 have been submitted to and approved in writing by the Local Planning Authority. Full details shall include all components of the proposed drainage system in accordance with the including dimensions, locations, gradients, invert and cover levels, headwall details, planting, fencing and drawings as appropriate together with confirmation of the gully spacing calculations to demonstrate they are capable of conveying the rainfall volumes as set out in the Approved Drainage strategy.

REASON: To ensure that the site is properly drained and does not increase the risk of flooding in accordance with policy CS1 of the Core Strategy.

 

28. No development shall commence until details of how the surface water drainage shall be maintained and managed after completion have been submitted to and approved in writing by the Local Planning Authority. The details shall include confirmation of the required maintenance activities with expected frequency, with site specific assessments included to demonstrate that health and safety has been fully considered in the design and that access and egress for future residents will be maintained during any operations to repair or replace drainage features.

REASON: To ensure that the site is properly drained and does not increase the risk of flooding in accordance with policy CS1 of the Core Strategy.

 

29. No dwelling hereby approved shall be occupied until the sustainable urban drainage scheme for this site has been completed in accordance with the submitted details. The sustainable urban drainage scheme shall be managed and maintained thereafter in accordance with the agreed management and maintenance plan. Written confirmation of agreements for the management and maintenance of the drainage scheme shall be submitted and approved by the Local Planning Authority.

REASON: To ensure that the site is properly drained and does not increase the risk of flooding in accordance with policy CS1 of the Core Strategy.

 

30. No dwelling hereby approved shall be occupied until a verification report, appended with substantiating evidence demonstrating the agreed/approved construction details and specifications have been implemented, will need to be submitted and approved (in writing) by the Council. This will include photos of excavations and soil profiles/horizons, any placement of tanking, crating, connecting pipe work, hydrobrakes, cover systems, etc.

REASON: To ensure that the site is properly drained and does not increase the risk of flooding in accordance with policy CS1 of the Core Strategy.

 

31. No part of the development shall be occupied until details of on-site refuse storage (including any open air storage facilities) for waste material awaiting disposal (including details of any screening) have been submitted to and approved in writing by the Local Planning Authority. Such facilities shall be provided in accordance with the approved details prior to the first occupation of the development and thereafter permanently retained.

REASON: To ensure the provision of satisfactory waste storage facilities in the interests of amenity.

[Relevant Policy: Relevant Policy: Core Strategy DPD CS13]

 

32. The hours of site clearance and construction shall be limited to:

- between 8:00 am and 6:00 pm Monday to Friday

- between 8:00 am and 1:00 pm Saturday

There shall be no site clearance or construction undertaken on Sundays and Public Holidays.

REASON: In the interests of the amenities of the occupiers of nearby residential premises.

[Relevant Policies: BFBLP EN25]