Agenda item

PS 19-00343-FUL Moat Farm, Winkfield Lane, Winkfield, Windsor, Berkshire SL4 4SR

Erection of 12 dwellings with parking, access, and landscaping following demolition of existing buildings.

 

Minutes:

Erection of 12 dwellings with parking, access, and landscaping following demolition of existing buildings.

 

The Committee noted:

 

·        The supplementary report of the Head of Planning tabled at the meeting.

·        Winkfield Parish Council’s objections, as detailed in the agenda papers.

·        A total of 42 objections received from 28 household, as summarised in the Agenda papers.

·        The one letter in support of the application from the current occupier of the site.

 

Following the completion of planning obligation(s) under Section 106 of the Town and Country Planning Act 1990 relating to:-

 

-A contribution towards active open space of public value

-Maintenance of the SUDS features

-A S278 agreement to secure works to provide pedestrian access and dropped kerbs at the site entrance.

 

RESOLVED that the Head of Planning be authorised to APPROVE the application subject to the following condition(s):-

 

01        The development hereby permitted shall be carried out only in accordance with the following approved plans and other submitted details received by the Local Planning Authority on 29.11.2019, 17.02.2020, 14.01.2019, 31.08.2019,

 

LP Rev B

001 Rev E

 

010 RevA

011 RevA

012 RevC

013 RevA

014 RevA

015 RevB

016 RevB

017 RevA

021 Rev B

MIG22028-03

REASON: To ensure that the development is carried out only as approved by the local Planning Authority.

 

 

02        The development hereby permitted shall be carried out only in accordance with the following approved plans and other submitted details received by the Local Planning Authority on 29.11.2019, 17.02.2020, 14.01.2019, 31.08.2019,

 

LP Rev B

C001 Rev E

 

010 RevA

011 RevA

012 RevC

3

013 RevA

014 RevA

015 RevB

016 RevB

017 RevA

021 Rev B

MIG22028-03

REASON: To ensure that the development is carried out only as approved by the local Planning Authority.

 

03        No development above slab level shall take place until samples of the materials to include bricks, roof tiles and timbers, to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details.

REASON: In the interests of the visual amenities of the area.

[Relevant Policies: BFBLP EN20, Core Strategy DPD CS7]

 

04        No development shall commence until details showing the finished floor levels of the buildings hereby approved in relation to a fixed datum point have been submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in accordance with the approved details.

REASON: In the interests of the character of the area.

[Relevant Policies: SEP CC6, BFBLP EN20, Core Strategy DPD CS7]

 

05        No dwelling shall be occupied until a means of vehicular access has been constructed in accordance with the approved site plan.

REASON: In the interests of highway safety.

[Relevant Policies: Core Strategy DPD CS23]

 

06        No dwelling shall be occupied until visibility splays of 2.0 metres by 2.0 metres have been provided at the junction of the driveway and the adjacent carriageway. The dimensions shall be measured along the edge of the drive and the edge of the carriageway from their point of intersection. The visibility splays shall at all times thereafter be kept free of all obstructions to visibility over a height of 0.6 metres measured from the surface of the carriageway.

REASON: In the interests of highway safety.

[Relevant Policies: Core Strategy DPD CS23]

 

07        No dwelling shall be occupied until the associated vehicle parking and turning space has been surfaced and marked out in accordance with the approved drawing. The spaces shall thereafter be kept available for parking at all times.

REASON: To ensure that the development is provided with adequate car parking to prevent the likelihood of on-street car parking which would be a danger to other road users.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

08        The garage accommodation shall be retained for the use of the parking of vehicles at all times, unless otherwise agreed in writing by the Local Planning Authority.

REASON: To ensure that the Local Planning Authority’s vehicle parking standards are met.

[Relevant Policy: BFBLP M9]

9          The car ports hereby approved shall be retained for the use of the parking of vehicles at all times and, notwithstanding the provisions of the Town and Country (general Permitted Development) Order 1995 (or any order revoking or re-enacting that Order with or without modification), no enlargements, improvements or alterations shall be made to the car port, and no gate or door shall be

erected to the front of the car port.

REASON: To ensure that the development is provided with adequate parking to prevent the likelihood of on-street parking which could be a danger to other road users.

[Relevant Policy: BFBLP M9]

 

10        No dwelling shall be occupied until a scheme has been submitted to and approved in writing by the Local Planning Authority for covered and secure cycle parking facilities. No dwelling shall be occupied until the approved scheme has been implemented. The facilities save as otherwise agreed in writing by the Local Planning Authority shall be retained.

REASON: In the interests of accessibility of the development to cyclists.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

11        Any gates provided shall open away from the highway and be set back a distance of at least 10 metres from the edge of the Winkfield Lane  carriageway of the adjoining highway.

REASON: In the interests of highway safety.

[Relevant Policies: Core Strategy DPD CS23]

 

12        No dwelling shall be occupied until  a scheme has been submitted to and approved in writing by the Local Planning Authority for off site highway works and pedestrian improvements at the access to the site with Winkfield Lane.

The dwellings provided by the carrying out of the development shall not be occupied until the off site highway works have been completed in accordance with the scheme.

REASON: In the interests of highway safety.

[Relevant Policy: BFBLP M4

 

13        No dwelling shall be occupied until a pedestrian crossing point has been provided across Winkfield Lane close to the site access incorporating dropped kerbs and tactile paving.

REASON: In the interests of highway safety and pedestrian amenity.

[Relevant Policy: Core Strategy CS23, CS34; NPPF paragraphs 110 a) to c)]

 

14        No dwelling shall be occupied until details of the design, operation and ongoing maintenance regime for electric vehicle charging infrastructure with a minimum output of 7kW to be provided for the three proposed visitors parking spaces shown on the approved Site Plan has been submitted to and approved in writing by the Local Planning Authority. Thereafter the electric vehicle charging infrastructure shall be provided for the three visitor parking spaces and maintained in working order.

REASON: In the interests of sustainable transport.

[Relevant Policy: NPPF paragraph 110 e); Parking Standards SPD paragraph 3.8 part 1 (established through NPPF paragraph 105 e)].

 

15        The development hereby permitted shall not be begun until a scheme has been submitted to and approved in writing by the Local Planning Authority, to accommodate:

(a) Parking of vehicles of site personnel, operatives and visitors

(b) Loading and unloading of plant and vehicles

(c) Storage of plant and materials used in constructing the development

(d) Wheel cleaning facilities

(e) Temporary portacabins and welfare for site operatives

and each facility shall be retained throughout the course of construction of the development, free from any impediment to its designated use. No other areas on the site, other than those in the approved scheme shall be used for the purposes listed (a) to (e) above without the prior written permission of the Local Planning Authority.

REASON: In the interests of amenity and road safety.

 

16        No dwelling shall be occupied until a comprehensive scheme providing details of both hard and soft landscaping works has been submitted to and approved in writing by the Local Planning Authority.

These details shall include:-

a) Comprehensive planting plans of an appropriate scale and level of detail that provides adequate clarity including details of ground preparation and all other operations associated with plant and grass establishment, full schedules of plants, noting species, and detailed plant sizes/root stock specifications, planting layout, proposed numbers/densities locations.

b) Details of semi mature tree planting.

c) Comprehensive 5 year post planting maintenance schedule.

d) Underground service and external lighting layout (drainage, power, communications cables, pipelines etc. indicating lines, manholes etc.), both existing reused and proposed new routes.

e) Means of enclosure (walls and fences etc)

f) Paving including pedestrian open spaces, paths, patios, proposed materials and construction methods, cycle routes, parking courts, play areas etc. All planting comprised in the soft landscaping works shall be carried out and completed in full accordance with the approved scheme, in the nearest planting season (1st October to 31st March inclusive) to the completion of the development or prior to the occupation of any part of the approved development, whichever is sooner, or as may otherwise be agreed in writing by the Local Planning Authority. All hard landscaping works shall be carried and completed prior to the occupation of any part of the approved development. As a minimum, the quality of all hard and soft landscape works shall be carried out in accordance with British Standard 4428:1989 ‘Code Of practice For General Landscape Operations’ or any subsequent revision. All trees and other plants included within the approved details shall be healthy, well formed specimens of a minimum quality that is compatible with British Standard 3936:1992 (Part 1) ‘Specifications For Trees & Shrubs’ and British Standard 4043 (where applicable) or any subsequent revision. Any trees or other plants which within a period of 5 years from the completion of the development, die, are removed, uprooted, are significantly damaged, become diseased or deformed, shall be replaced during the nearest planting season (1st October to 31st March inclusive) with others of the same size, species and quality as approved, unless the Local

Planning Authority gives written consent to any variation.

REASON: In the interests of good landscape design and the visual amenity of the area.

[Relevant Policies: BFBLP EN2 and EN20, CSDPD CS7]

 

17        No development shall commence until an investigation and risk assessment, in addition to any assessment provided with the planning application, has been completed in accordance with a scheme to assess the nature and extent of any contamination on the site, whether or not it originates on the site. The contents of the scheme are subject to the approval in writing of the Local Planning Authority.

The investigation and risk assessment must be undertaken by competent persons and a written report of the findings must be produced. The written report is subject to the approval in writing of the Local

Planning Authority. The report of the findings must include:

(i) a survey of the extent, scale and nature of contamination;

(ii) an assessment of the potential risks to:

• human health,

• property (existing or proposed) including buildings, crops, livestock, pets, woodland and service lines and pipes,

• adjoining land,

• groundwaters and surface waters,

• ecological systems,

• archaeological sites and ancient monuments;

(iii) an appraisal of remedial options, and proposal of the preferred option(s).

This must be conducted in accordance with DEFRA and the Environment Agency’s ‘Model Procedures for the Management of Land Contamination, CLR 11’.

Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. In the interests of the amenities of the area.

[Relevant Policies: BFBLP EN25]

 

18        No development shall commence until a detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment has been prepared and approved in writing of the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works and site management procedures. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation.

REASON: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. In the interests of the amenities of the area.

[Relevant Policies: BFBLP EN25]

 

19        The approved remediation scheme must be carried out in accordance with its terms prior to the commencement of development other than that required to carry out remediation, unless otherwise agreed in writing by the Local Planning Authority. The Local Planning Authority must be given two weeks written notification of commencement of the remediation scheme works. Following completion of measures identified in the approved remediation scheme, a verification report that demonstrates the effectiveness of the remediation carried out must be produced, and is subject to the approval in writing of the Local Planning Authority.

REASON: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to, neighbours and other offsite receptors.

In the interests of the amenities of the area.

[Relevant Policies: BFBLP EN25]

 

20        In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken in accordance with the requirements of condition 17, and where remediation is necessary a remediation scheme must be prepared in accordance with the requirements of condition 18 which is subject to the approval in writing of the Local Planning Authority.  Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority in accordance with condition 19.

REASON: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. In the interests of the amenities of the area.

[Relevant Policies: BFBLP EN25]

 

 

21        No dwelling shall be occupied until a monitoring and maintenance scheme to include monitoring the long-term effectiveness of the proposed remediation over a period of time has been submitted to and approved in writing by the Local Planning Authority. Following completion of the measures identified in that scheme and when the remediation objectives have been achieved, reports that demonstrate the effectiveness of the monitoring and maintenance carried out must be produced, and submitted to the Local Planning Authority. This must be conducted in accordance with DEFRA and the Environment Agency’s ‘Model Procedures for the Management of Land Contamination, CLR 11’.

REASON: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. In the interests of the amenities of the area.

[Relevant Policies: BFBLP EN25]

 

22        No work relating to the development hereby approved, including works of demolition or preparation prior to building operations, shall take place other than between the hours of 08:00 and 18:00 Monday to Friday and 08:00 to 13:00 Saturdays and at no time on Sundays or Bank or National Holidays.

REASON: To protect the occupiers of neighbouring properties from noise and disturbance outside the permitted hours during the construction period.

[Relevant Policies: BFBLP EN25]

 

23        The development hereby permitted shall be carried out in accordance with the mitigation measures specified in: AAe GCN Mitigation Plan January 2020, which shall thereafter be retained in accordance with the approved details. An ecological site inspection report shall be submitted for approval within three months of the first occupation of any dwelling hereby approved and after five years of the first occupation.

REASON: In the interests of nature conservation

[Relevant Plans and Policies: BFBLP EN3, CSDPD CS1 and CS7]

 

24        If more than 2 years elapse between the previous protected species surveys and the due commencement date of works, an updated protected species survey shall be carried out by a suitably qualified ecologist. A report confirming the results and implications of the assessment, including any revised mitigation measures, shall be submitted to the Local Planning Authority before construction

works commence on site.

Reason: To ensure the status of protected species on site has not changed since the

last survey.

[Relevant Plans and Policies: BFBLP EN3, CSDPD CS1 and CS7]

 

25        No development shall commence until the applicant have implemented a programme of archaeological field evaluation in accordance with a written scheme of investigation, which has been submitted by the applicant and approved in writing by the Local Planning Authority. The results of the evaluation will inform the preparation of a mitigation strategy which will be submitted by the applicant and approved in writing by the Local Planning Authority prior to the commencement of the development. The mitigation strategy shall be implemented in accordance with the approved details.

 

26        No development shall commence until an Energy Demand Assessment has been submitted to and approved in writing by the Local Planning Authority. This Assessment shall demonstrate how (a) the development in that relevant Phase will reduce carbon dioxide emissions by at least 10% and detail what specific measures will be carried out to ensure this, and (b) where relevant will outline, what proportion of the buildings energy requirements will be provided from onsite renewable energy

production (which proportion shall be 20% unless otherwise agreed in writing by the Local Planning Authority).

 

The buildings shall be constructed in accordance with the approved Energy Demand Assessment and retained in accordance therewith, unless the Local Planning Authority gives prior written consent to any variation.

REASON: In the interests of the sustainability and the efficient use of resources.

[Relevant Plans and Policies: CSDPD CS12]

 

27        No development shall commence until a Sustainability Statement covering water efficiency aimed at achieving an average water use in new dwellings of 110 litres/person/day, has been submitted to, and agreed in writing by the Local Planning Authority. The development shall be implemented in accordance with the Sustainability Statement, as approved, and retained as such thereafter.

REASON: In the interests of sustainability and the efficient use of resources.

[Relevant Policy: Core Strategy DPD CS10]

 

28        Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting that order with or without modification) no enlargement, addition, improvement or other alteration permitted by Classes A, B, C and E of Part 1 of the Second Schedule of the 1995 Order shall be carried out.

The site is located within the designated Green Belt where strict controls over the form, scale and nature of development apply.

[Relevant Policies: BFBLP GB1, Core Strategy DPD CS9]

 

29        Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) or any Order revoking and re-enacting that order, no external lighting shall be installed on the site or affixed to any buildings on the site except in accordance with details set out in a lighting design strategy  that has first been submitted to and approved in writing by the Local Planning Authority. The strategy shall:

a)         identify those area/features on site that are particularly sensitive for bats and that are likely to cause disturbance in or around their breeding sites and resting places or along important routes used to access key areas of their territory, for example, for foraging; and

b)         show how and where external lighting will be installed (through the provision of appropriate lighting contour plans and technical specifications) so that it can be clearly demonstrated that areas to be lit will not disturb or prevent bats using their territory or having access to their breeding sites and resting places.

All external lighting shall be installed in accordance with the specifications and locations set out in the strategy, and these shall be maintained thereafter in accordance with the strategy. Under no circumstances should any other external lighting be installed without prior consent from the local planning authority.

 

REASON: In the interests of the rural character of the area.

[Relevant Policies: BFBLP EN2O and EN25]

 

30        Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order (England)2015 (or any order revoking or re-enacting that Order with or without modification), no  fences, gates,  walls,  or other means of enclosure as permitted by  Class A of Part 2 of the Second Schedule of the 2015 Order, other than those indicated on the approved drawings, shall be erected or planted on the site.

To protect and preserve the character of the Scheduled Monument.

[Relevant Policies: Core Strategy CS1]

 

31        A landscape and ecological management plan (LEMP) shall be submitted to, and approved in writing by, the local planning authority prior to the occupation of the development. The content of the LEMP shall include the following:

a) Description and evaluation of features to be managed

b) Ecological trends and constraints on site that might influence management

c) Aims and objectives of management

d)Appropriate management options for achieving aims and objectives

e) Prescriptions for management actions

f) Preparation of a work schedule (including an annual work plan capable of being rolled forward over a five-year period)

g) Details of the body or organization responsible for implementation of the plan

h) On-going monitoring and remedial measures

The LEMP shall also include details of the legal and funding mechanism(s) by which the long-term implementation of the plan will be secured by the developer with the management bodies responsible for its delivery.  The plan shall also set out (where the results from monitoring show that conservation aims and objectives of the LEMP are not being met) how contingencies and/or remedial action will be identified, agreed and implemented so that the development still delivers the fully functioning biodiversity objectives of the originally approved scheme.

REASON: In the interests of nature conservation and the visual amenity of the area.

[Relevant Policies: CSDPD CS1]

 

32.       The habitat features identified as being valuable in the GCN mitigation plan shall be retained, unless otherwise approved in writing by the Local Planning Authority.

Reason: To ensure habitat connectivity and support local wildlife populations.

[Relevant Policies: CSDPD CS1]

 

33.       No properties shall be occupied until confirmation has been provided that either:

- all wastewater network upgrades required to accommodate the additional flows from the development have been completed; or

- a housing and infrastructure phasing plan has been agreed with Thames Water to allow additional properties to be occupied.

Where a housing and infrastructure phasing plan is agreed no occupation shall take place other than in accordance with the agreed housing and infrastructure phasing plan.

Reason - The development may lead to sewage flooding and network reinforcement works are anticipated to be necessary to ensure that sufficient capacity is made available to accommodate additional flows anticipated from the new development. Any necessary reinforcement works will be necessary in order to avoid sewer flooding and/or potential pollution incidents.

 

34        No development shall take place until full details of the Drainage System(s) have been submitted to and approved in writing by the Local Planning Authority. These shall include:

Results of intrusive ground investigations demonstrating the depth of the seasonally high groundwater table; full details of all components of the proposed drainage system including dimensions, locations, gradients, invert and cover levels, headwall details, planting (if necessary) and drawings as appropriate taking into account the groundwater table, and details of the works to modify the ditches.

REASON: To ensure that the site is properly drained and does not increase the risk of flooding in accordance with policy CS1 of the Core Strategy.

 

35        No dwelling shall be occupied until a verification report, appended with substantiating evidence demonstrating the agreed/approved construction details and specifications have been implemented, has been submitted and approved (in writing) by the Council. This will include photos of excavations and soil profiles/horizons, any placement of tanking, crating, connecting pipe work, hydrobrakes, cover systems etc.

Reason: To ensure that the site is properly drained and does not increase the risk of flooding In accordance with policy CS1 of the Core Strategy.

 

36        No dwelling shall be occupied until fencing along the boundary of the site with Winkfield Lane has been removed.

REASON: To protect and preserve the setting of the Scheduled Monument listed building

[Relevant Policies:  Core Strategy CS1]