Application No 19/00328/FUL - Holm Wood, Forest Road, Binfield

Erection of 3 no. 3 bedroom dwellings and associated access, parking, bin and cycle stores, following demolition of existing dwelling and outbuildings

Minutes:

Erection of 3 no. 3 bedroom dwellings and associated access, parking, bin and cycle stores, following demolition of existing dwelling and outbuildings

 

A site visit had been held on Saturday 15 June 2019, which had been attended by Councillors Barnard, Bhandari Birch, Brown, Dudley, Green, Mrs Hayes, Mrs McKenzie-Boyle, Mossom, Parker, Turrell and Virgo.

 

The Committee noted:

·         The supplementary report of the Head of Planning tabled at the meeting.

·         The comments of Binfield Parish Council objecting to the proposal.

·         The 2 letters of objection received as summarised in the Agenda papers.

 

RESOLVED that the application be APPROVED subject to the following conditions:-

 

1.    The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

REASON:  To comply with Section 91 of the Town and Country Planning Act 1990.

 

2.    The development hereby permitted shall be carried out only in accordance with the following approved plans received by the Local Planning Authority on 8th of April 2019, 18th of April 2019 and 7th of June 2019:

 

Site plan

Location Plan

Plans, Elevations and Section A-A, drawing no.21901-01 02

Site Plan and Street Scene Elevation, drawing no.21901-1 01 Rev C (amended)

 

REASON: To ensure that the development is carried out only as approved by the Local Planning Authority

 

3.    No construction works shall take place until brick and tile samples to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority.  The development shall be carried out in accordance with the approved details.

REASON: In the interests of the visual amenities of the area.

[Relevant Policies: BFBLP EN20, Core Strategy DPD CS7]

 

4.    No construction works shall take place until details showing the finished floor levels of the dwellings hereby approved in relation to a fixed datum point have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details.

REASON: In the interests of the character of the area.

[Relevant Policies: BFBLP EN20, Core Strategy DPD CS7]

 

5.    No construction works shall take place until a scheme depicting hard and soft landscaping has been submitted to and approved in writing by the Local Planning Authority. The scheme shall include details of the proposed maximum heights of the planting and include a 3 year post planting maintenance schedule.

All planting comprised in the soft landscaping works shall be carried out and completed in full accordance with the approved scheme, in the nearest planting season (1st October to 31st March inclusive) to the completion of the development or prior to the occupation of any part of the approved development, whichever is sooner. All hard landscaping works shall be carried and completed prior to the occupation of any part of the approved development. As a minimum, the quality of all hard and soft landscape works shall be carried out in accordance with British Standard 4428:1989 'Code Of practice For General Landscape Operations' or any subsequent revision. All trees and other plants included within the approved details shall be healthy, well-formed specimens of a minimum quality that is compatible with British Standard 3936:1992 (Part 1) 'Specifications For Trees & Shrubs' and British Standard 4043 (where applicable) or any subsequent revision.  Any trees or other plants which within a period of 5 years from the completion of the development, die, are removed, uprooted, are significantly damaged, become diseased or deformed, shall be replaced during the nearest planting season (1st October to 31st March inclusive) with others of the same size, species and quality as approved.

REASON: In the interests of good landscape design and the visual amenity of the area.

[Core Strategy DPD CS7, BFBLP 'Saved' Policies EN2 and EN20]

 

6. The first floor and second floor windows in the eastern side elevation of the dwellinghouse on plot 3 and western side elevation of the dwellinghouse on plot 1 hereby permitted shall not be glazed at any time other than with a minimum of Pilkington Level 3 obscure glass (or equivalent). They shall at all times be non-opening unless the parts of the windows that can be opened are more than 1.7m above the floor of the room they serve.

 

REASON: To prevent the overlooking of neighbouring properties [Relevant policies: BFBLP EN20]

 

6.    Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any Order revoking and re-enacting that Order with or without modification) no additional windows, similar openings or enlargement thereof shall be constructed at first floor level and above in the east or west facing side elevations of the dwellings hereby permitted except for any which may be shown on the approved drawings.

REASON: To prevent the overlooking of neighbouring property.

[Relevant Policies: BFBLP EN20]

 

7.    No development shall be occupied until a means of vehicular access has been constructed in accordance with the approved plans.

REASON: In the interests of highway safety.

[Relevant Policies: Core Strategy DPD CS23]

 

8.    No development shall be occupied until the associated vehicle parking and turning space has been set out in accordance with the approved drawing. The spaces shall thereafter be kept available for parking at all times.

REASON: To ensure that the development is provided with adequate car parking to prevent the likelihood of on-street car parking which would be a danger to other road users.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

9.    No development shall be occupied until secure and covered parking for bicycles has been provided in accordance with the approved drawings. They shall thereafter be retained as such.

REASON: In order to ensure bicycle facilities are provided.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

10.  No development shall take place until a scheme has been submitted to and approved in writing by the Local Planning Authority, to accommodate:

(a)        Parking of vehicles of site personnel, operatives and visitors

(b)        Loading and unloading of plant and vehicles

c)         Storage of plant and materials used in constructing the development

(d)        Wheel cleaning facilities

(e)        Temporary portacabins and welfare for site operatives

and each facility shall be retained throughout the course of construction of the development, free from any impediment to its designated use.  No other areas on the site, other than those in the approved scheme shall be used for the purposes listed (a) to (e) above.

REASON: In the interests of amenity and road safety.

 

11.  The demolition shall not be begun until a scheme for the provision of biodiversity enhancements (not mitigation), including a plan or drawing showing the location of these enhancements, has been submitted to and approved in writing by the Local Planning Authority.

The approved scheme shall be performed, observed and complied with.

REASON: In the interests of nature conservation

[Relevant Plans and Policies: CSDPD CS1, CS7]

 

12.  No part of any dwelling shall be occupied until a Sustainability Statement covering water efficiency aimed at achieving an average water use in new dwellings of 110 litres/person/day, has been submitted to, and agreed in writing by, the Local Planning Authority. The development shall be implemented in accordance with the Sustainability Statement, as approved, and retained as such thereafter.

REASON: In the interests of sustainability and the efficient use of resources.

[Relevant Policy: Core Strategy DPD CS10]

 

13.  No construction works shall take place until an Energy Demand Assessment demonstrating that at least 10% of the development's energy will be provided from on-site renewable energy production, has been submitted to and approved in writing by the Local Planning Authority. The dwelling as constructed shall be carried out in accordance with the approved assessment and retained as such thereafter.          

REASON: In the interests of sustainability and the efficient use of resources.

[Relevant Policy: Core Strategy DPD CS12]

 

14.  The development shall incorporate surface water drainage that is SuDS compliant and in accordance with DEFRA "Sustainable Drainage Systems - Non-statutory technical standards for sustainable drainage systems" (March 2015).  The surface water drainage works shall be completed before occupation of the dwellings/buildings hereby permitted and shall be operated and maintained as such thereafter. 

 

REASON: To prevent increased risk of flooding, to improve and protect water quality and ensure future maintenance of the surface water drainage scheme. [Relevant Policies: CSDPD CS1, BFBLP EN25]

 

 

 

 

 