Agenda item

22-00425-FUL Land To Rear Of 29 Warfield Road and 7 Sherring Close

Erection of 3no. detached self-build dwellings (Alternative to planning permission ref: 19/00023/FUL).

Minutes:

Erection of 3no. detached self-build dwellings (Alternative to planning permission ref: 19/00023/FUL).

 

The Committee noted:

 

·       The supplementary report tabled at the meeting.

·        The comments of Bracknell Town Council letters objecting to the proposal as summarised in the agenda.

·       The 12 letters of objection as summarised in the agenda.

 

Following the completion of planning obligation(s) under Section 106 of the

Town and Country Planning Act 1990 relating to:

 

- Measures to avoid and mitigate the impact of residential development upon the Thames Basin Heaths Special Protection Area (SPA);

 

RESOLVED that the Assistant Director: Planning be authorised to APPROVE the application subject to the following conditions amended, added to or

deleted as necessary:-

 

01. The development hereby permitted shall be begun before the expiration of three

years from the date of this permission.

REASON: To comply with Section 91 of the Town and Country Planning Act 1990.

 

02. The development hereby permitted shall be carried out only in accordance with the following approved plans received by the Local Planning Authority on:

 

08 Nov 2022:

21.021.WD. 203/K Site Plan General Arrangement

 

02 Sept 2022:

21.021.WD.211/C

 

24 Aug 2022:

21.021.WD.210/D

21.021.WD.212/A

 

REASON: To ensure that the development is carried out only as approved by the Local Planning Authority.

 

03. The materials to be used in the construction of the external surfaces of the

development hereby permitted shall be in compliance with dwg 21.021.WD.214 and

21.021.WD. 204 Rev J dated April 2022.

REASON: In the interests of the visual amenities of the area.

[Relevant Policies: BFBLP 'Saved' Policy EN20; Core Strategy DPD CS7]

 

04. The development hereby permitted shall be constructed in accordance with the finished floor levels shown on drawing 21.021.WD. 204 Rev K dated May 2022.

REASON: In the interests of the character of the area.

[Relevant Policies: BFBLP 'Saved' Policy EN20, Core Strategy DPD CS7]

 

05. The development shall not be occupied until a scheme depicting hard and soft

landscaping has been submitted to and approved in writing by the Local Planning

Authority. The scheme shall include a 3 year post planting maintenance schedule.

All planting comprised in the soft landscaping works shall be carried out and

completed in full accordance with the approved scheme, in the nearest planting

season (1st October to 31st March inclusive) to the completion of the development or

prior to the occupation of any part of the approved development, whichever is sooner. All hard landscaping works shall be carried and completed prior to the occupation of any part of the approved development. As a minimum, the quality of all hard and soft landscape works shall be carried out in accordance with British Standard 4428:1989 'Code of Practice For General Landscape Operations' or any subsequent revision. All trees and other plants included within the approved details shall be healthy, well formed specimens of a minimum quality that is compatible with British Standard 3936:1992 (Part 1) 'Specifications For Trees & Shrubs' and British Standard 4043 (where applicable) or any subsequent revision. Any trees or other plants which within a period of 5 years from the completion of the development, die, are removed, uprooted, are significantly damaged, become diseased or deformed, shall be replaced during the nearest planting season (1st October to 31st March inclusive) with others of the same size, species and quality as approved.

REASON: In the interests of good landscape design and the visual amenity of the

area. [Relevant Policies: BFBLP EN2 and EN20, CSDPD CS1 and CS7]

 

06. No development shall be occupied until details of the boundary treatments (fencing, hedges, walls) have been submitted to and approved in writing by the Local Planning Authority. The approved details shall thereafter be implemented prior to occupation of the dwellings and retained as such. All boundary treatments shall provide for the free movement of wildlife to and from the site.

REASON: In the interests of the visual amenity of the area, and biodiversity

[Relevant Plans and Policies: CSDPD CS1, CS7]

 

07. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (or any order revoking and re-enacting that order with or without modification), no windows or dormer windows at first floor level or above shall be installed on any of the north or south-facing elevations of the dwellings of Plot 1, 2 or 3 hereby approved or in the eastern elevation of Plot 3, with the exception of those shown on the approved plans.

REASON: In the interests of the residential amenity of the neighbouring residential properties

[Relevant Policy: BFBLP 'Saved' Policy EN20].

 

08. No dwelling hereby permitted shall be occupied until the means of vehicular and pedestrian access to that dwelling has been provided in accordance with drawing

21.021.WD.203 revision K and 21.021.WD.204 revision J with details of construction and materials to be submitted to and approved in writing by the Local Planning Authority.  The access road and turning area shall be surfaced in a bound or bonded material to reduce noise and dust and to avoid deposition of loose material onto the highway. Thereafter the means of vehicular and pedestrian access shall remain clear of obstruction. Two further areas shall also remain clear of obstruction above 100mm

above the height of the carriageway to allow turning by a fire tender to be undertaken as shown on drawing 21.021.WD.203 revision K (bottom panel):

(a) area beyond the northern end of the turning head; and

(b) are between the porches of plot 1 and plot 2.

REASON: In the interests of highway safety, to ensure access by emergency vehicles, and for the amenity of surrounding properties and the local area.

[Relevant Policies: Core Strategy DPD CS23; BFB Local Plan EN20 (vii)]

 

09.No dwelling hereby permitted shall be occupied until:

(a) Priority working signs and markings have been provided at the locations annotated on drawing 21.021.WD.203 revision K with clear visibility to the signs of at least 17m as shown on drawing 21.021.WD.203 revision K.

(b) Visibility splays have been provided in the following locations:

(i) at the junction of the site access with Warfield Road in accordance with drawing 2541-PL-07 'Block Plan Showing Vision Splays Site Access Swept Paths', received by the Local Planning Authority on 22 February 2019.

(ii) south-west of plot 3 as shown dashed orange on plan 21.021.WD.203 revision K.

(iii) between a waiting vehicle south-west of plot 3 and an approaching vehicle from the east of at least 19m as annotated on drawing 21.021.WD.203 revision K.

The areas providing visibility to signs and visibility splays shall thereafter be kept free of all obstructions to visibility over a height of 0.6 metres measured from the surface of the adjacent carriageway.

REASON: In the interests of highway safety.

[Relevant Policies: Core Strategy DPD CS23]

 

10. No dwelling shall be occupied until the associated vehicle parking and turning space for 3 cars per dwelling has been surfaced and marked out in accordance with the drawing 21.021.WD.204 revision J with electric vehicle charging points for each dwelling with an output of at least 7kW provided in the locations marked with a blue circle on plan 21.021.WD.204 revision J. The spaces and turning areas shall thereafter be kept available for parking and turning at all times.

REASON: To ensure that the development is provided with adequate car parking designed to enable charging of plug-in vehicles and to prevent the likelihood of on-street car parking which would be a danger to other road users.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23, NPPF 112 e)]

 

11. No dwelling shall be occupied until 4 secure and covered cycle parking spaces per dwelling have been provided in the locations identified 'Secure cycle store' for cycle parking on plan 21.021.WD.204 revision J and access between these secure cycle stores and the carriageway of the accessway has been provided. The cycle parking spaces and access routes to these shall thereafter be retained.

REASON: In the interests of accessibility of the development to cyclists.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

12. No dwelling hereby permitted shall be occupied until a bin collection point has been provided south of the access road south of no. 29 Warfield Road in the location

annotated BCP on the approved plans (within 25 metres of the adopted highway of

Warfield Road). The bin collection point shall be retained thereafter.

REASON: In order to ensure that waste collection can be undertaken, in the interests

of highway safety, character of the area and amenity of residents.

[Relevant Policies: BFBLP 'Saved' Policies EN20, Core Strategy DPD CS7 and CS23]

 

13. Notwithstanding the approved plans, the porches to the front (north east elevation) of plots 1 and 2 shall be open-sided and open-fronted in order that waste receptacles can be moved from their storage location to the access road through the porch. The access routes between waste stores and the access road under the porches for plots 1 and 2 shall thereafter be kept clear for movement of waste receptacles at all times.

REASON: In order to ensure that waste collection can be undertaken, in the interests

of highway safety, character of the area and amenity of residents.

[Relevant Policies: BFBLP 'Saved' Policies EN20, Core Strategy DPD CS7 and CS23]

 

14. No development shall take place until a scheme has been submitted to and approved in writing by the Local Planning Authority, to accommodate:

(a) Parking of vehicles of site personnel, operatives and visitors;

(b) Loading and unloading of plant and vehicles;

(c) Storage of plant and materials used in constructing the development;

(d) Wheel cleaning facilities,

(e) Temporary portacabins and welfare for site operatives, and

(f) Sufficient area for turning such that the largest anticipated construction vehicle can arrive in a forward gear from Warfield Road, turn within the development area, and depart onto Warfield Road in a forward gear.

(g) Measures to control the emission of dust, dirt and noise during construction;

Each facility shall be retained throughout the course of construction of the development, free from any impediment to its designated use. No other areas on the site, other than those in the approved scheme shall be used for the purposes listed (a) to (f) above.

REASON: In the interests of visual amenity, amenity of surrounding properties and road safety

[Relevant Policies: CSDPD Policy CS7 & CS23, BFBLP 'Saved' Policy EN20]

 

15. The badger run shall be provided in accordance with dwg 21.021.WD.204  revision J and be retained thereafter.

REASON: In the interests of nature conservation               

[Relevant Plans and Policies: CSDPD CS1, CS7]

 

16. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) or any Order revoking and re-enacting that Order, and with the exception of the lighting shown on dwg 21.021.WD.204 revision J, no further external lighting shall be installed on the site or affixed to any dwellings on the site except in accordance with details set out in a lighting design strategy for biodiversity that has first been submitted to and approved in writing by the Local Planning Authority. The strategy shall:

a) identify those areas/features on site that are particularly sensitive for badgers and that are likely to cause disturbance in or around their breeding sites and resting places or along important routes used to access key areas of their territory, for example, for foraging; and

b) show how and where external lighting will be installed (through the provision of appropriate lighting contour plans and technical specifications) so that it can be clearly demonstrated that areas to be lit will not disturb or prevent badgers using their territory or having access to their breeding sites and resting places.

All external lighting thereby approved shall be installed in accordance with the specifications and locations set out in the strategy, and shall be maintained thereafter in accordance with the strategy.

REASON: In the interests of nature conservation               

[Relevant Plans and Policies: CSDPD CS1, CS7]

 

17. The biodiversity enhancements (not mitigation) shown on  21.021.WD.204 revision J shall be performed, observed and complied with prior to occupation of the dwellings and retained in perpetuity.

REASON: In the interests of nature conservation

[Relevant Policies: CSDPD Policies CS1, CS7]

 

18. An ecological site inspection report shall be submitted to the Local Planning Authority within three months of the first occupation of any dwelling hereby approved and approved in writing by the Local Planning Authority. Any recommendations contained within this report and agreed in writing by the Local Planning Authority shall be performed, observed and complied with.

REASON: In the interests of nature conservation

[Relevant Plans and Policies: CSDPD CS1, CS7]

 

19. The development shall be implemented in accordance with the Water Efficiency

letter produced by Energy Test 2 February 2022 and retained as such thereafter.

REASON: In the interests of sustainability and the efficient use of resources. [Relevant Policy: Core Strategy DPD CS10]

 

20. The development shall be implemented in accordance with the Energy Statement

dated 16th May 2022 prepared by Energy Test and shall be retained in accordance

therewith.

REASON: In the interests of the sustainability and the efficient use of resources.

[Relevant Plans and Policies: CSDPD Policy CS12]

 

21.No development shall commence until full details of the Drainage System have been submitted to and approved in writing by the Local Planning Authority. These shall include:

i) Full details of all components of the proposed drainage system including dimensions, locations, gradients, invert and cover levels, headwall details, planting and drawings as appropriate; and

ii) Further details of the proposals for the proposed mitigation measures for managing surface water flood risk within the site.

iii) Details that Thames Water have been consulted to obtain their confirmation that the proposals will not have detrimental impact on the existing Thames Water owned culvert running through the site.

REASON: To ensure that the site is properly drained and does not increase the risk of flooding in accordance with policy CS1 of the Core Strategy.

 

22.No development shall commence until details of how the surface water drainage

system (inclusive of flood mitigation measures) shall be maintained and managed after completion have been submitted to and approved in writing by the Local Planning Authority. The details shall include confirmation of the required maintenance activities with expected frequency, with site specific assessments included to demonstrate that health and safety has been fully considered in the design and that access and egress for future residents will be maintained during any operations to repair or replace drainage features.

REASON: To ensure that the site is properly drained and does not increase the risk of flooding In accordance with policy CS1 of the Core Strategy.

 

23. No dwelling hereby permitted shall be occupied until the sustainable urban drainage scheme for this site has been completed in accordance with the submitted details. The sustainable urban drainage scheme shall be managed and maintained thereafter in accordance with the agreed management and maintenance plan. Written confirmation of agreements for the management and maintenance of the drainage scheme shall be submitted to and approved in writing by the Local Planning Authority.

REASON: To ensure that the site is properly drained and does not increase the risk of flooding In accordance with policy CS1 of the Core Strategy.

 

24.No occupation of any dwelling shall take place until a verification report, appended

with substantiating evidence demonstrating the agreed/approved construction details

and specifications have been implemented to serve the particular property, has been

submitted to and approved in writing by the Local Planning Authority. This shall

include photos of excavations and soil profiles/horizons, any placement of tanking,

crating, connecting pipe work, hydrobrakes, cover systems, etc.

REASON: To ensure that the site is properly drained and does not increase the risk

of flooding in accordance with policy CS1 of the Core Strategy.

 

25. No development shall take place until details of proposed boundary treatments which shall not impact on existing flood flow routes (as set out in the PBA Technical Note dated 9 April 2019) have been submitted to and approved in writing by the Local Planning Authority. The approved details shall thereafter be implemented and retained as such.

REASON: To ensure that the site is properly drained and that the boundary treatments does not increase the risk of flooding.

[Relevant Policy: Core Strategy DPD CS1]

 

26. The dwellings hereby permitted shall not be occupied until details have been

submitted to and approved in writing by the Local Planning Authority regarding

information to be provided to prospective residents concerning aspects of any

drainage systems that serve multiple properties and the need for residents to

maintain the fencing details subject to condition 25.

REASON: To ensure that the site is properly drained and does not increase the risk

of flooding

[Relevant Policy: Core Strategy DPD CS1]

 

27. The following windows on the first floor side elevations of the dwellings hereby

permitted, shall not be glazed at any time other than with a minimum of Pilkington

Level 3 obscure glass (or equivalent). They shall at all times be fixed with the

exception of a top hung openable fanlight set at least 1.7 metres off the finished floor

levels:

- South and North facing elevation of Plot 1

- South and North facing elevation of Plot 2

- South facing elevation of Plot 3

Any replacement windows shall be glazed and fixed to this standard, and retained as

such.

REASON: In the interests of the residential amenity of the neighbouring properties

within the development hereby approved.

[Relevant Policy: BFBLP 'Saved' Policy EN20].

 

28. The roof lights on the north facing roof of Plot 1, south facing roof of Plot 2 and east facing roof of Plot 3 shall at all times be not less than 1.7 metres above internal floor level.

REASON: To prevent the overlooking of neighbouring properties.

[Relevant Policies: BFBLP EN20]

 

29. The development shall not be occupied until evidence has been provided to and agreed in writing by the Local Planning Authority that the development will be served by a superfast broadband (fibre optic) connection. Where it can be demonstrated that this would not be possible, practical or economically viable, through consultation with Next Generation Access (NGA) Network providers, sufficient and suitable ducting shall be provided within the site and to the dwellings to facilitate ease of installation at a future date. The agreed details shall be fully integrated into the proposed development and retained therein.

REASON: To provide high speed broadband

[Relevant Policies: Policy EC6 Broadband of the Bracknell Town Council Neighbourhood Plan 2021]

 

30. Prior to the erection of any gates on the development details of:

(a) the operation of the gates,

(b) how access through the gates by trades, deliveries, and emergency services will be achieved, and

(c) details of any access and intercom system

shall be submitted to and approved in writing by the Local Planning Authority. The approved details shall be implemented in full and retained as approved thereafter.

Reason: To avoid vehicles reversing onto Warfield Road in the interests of highway safety.

[Relevant policy: Core Strategy CS23; NPPF 110 b), 111 & 112 d)]

 

In the event of the S106 agreement not being completed by 28th February 2023, the Assistant Director: Planning be authorised to either extend the period further or refuse the application for the following reasons: -

 

01. In the absence of a planning obligation to secure suitable avoidance and

mitigation measures and access management monitoring arrangements, in

terms that are satisfactory to the Local Planning Authority, the proposal would

be contrary to Regulation 63(5) of the Conservation of Habitats and Species

Regulations 2017 (as amended), Policy NRM6 of the South East Plan, Policy

EN3 of the Bracknell Forest Borough Local Plan, Policy CS14 of the Core

Strategy Development Plan Document and the Thames Basin Heaths Special

Protection Area Supplementary Planning Document (2018).

 

Supporting documents: