Agenda item

21/00250/OUT Bracknell Town Football Club, Larges Lane, Bracknell, Berkshire, RG12 9AN

Outline application including access, appearance, layout and scale for demolition of existing dwelling and sports buildings and erection of 117 apartments with associated parking.

Minutes:

Outline application including access, appearance, layout and scale for demolition of existing dwelling and sports buildings and erection of 117 apartments with associated parking.

 

The Committee noted:

 

·       The supplementary report tabled at the meeting.

·       The comments of Bracknell Town Council having no objection to the application.

·       A petition containing 16 signatures.as summarised in the agenda.

·       The further letters of objection as detailed within the supplementary report.

·       That a site visit took place on the 14 May 2022 which was attended by Councillors Birch, Brossard, Brown, Dudley and Virgo.

 

RESOLVED that the Assistant Director: Planning be authorised to APPROVE the application subject to the completion of planning obligation(s) under Section 106 of the Town and Country Planning Act relating to the following matters, and the following conditions, added to or deleted as the Assistant Director: Planning considers necessary:

 

- Entering into s278 and s38 Agreements with the Highway Authority relating to works to Larges Lane to form the site access, lighting improvements and parking layby as well as the adoption of the internal access road and footway link to the Cricket Club.

- Car Club

- Affordable Housing

- Community Facility Contribution

- Contribution towards off-site OSPV

- SuDS specification/implementation/Management and Maintenance Strategy including monitoring contribution

 - SPA Mitigation

- Funding for Traffic Regulation Order (TRO) alterations on Larges Lane and any new TRO within the site to control indiscriminate parking and maintain safe access

- Biodiversity Net Gain monitoring

 

 

1. Approval of the details of landscaping of the development (hereinafter called "the reserved matters") shall be obtained from the Local Planning Authority in writing before      development is commenced. The plans and particulars in relation to the landscaping of the site shall be submitted in writing to the Local Planning Authority and shall be carried out as approved.

REASON:  To comply with Section 92 of the Town and Country Planning Act 1990 (as            amended).

 

2. Application for approval of the reserved matters shall be made to the Local Planning Authority before the expiration of three years from the date of this permission.

REASON:  To comply with Section 92 of the Town and Country Planning Act 1990 (as amended). 

 

3.The development hereby permitted shall be begun not later than the expiration of two years from the final approval of the reserved matters, or, in the case of approval on different dates, the final approval of the last such matter to be approved.

REASON:  To comply with Section 92 of the Town and Country Planning Act 1990 (as amended).

 

4. The development hereby permitted shall be carried out only in accordance with the following approved plans and documents

20-J3128-001 Rev.04 ‘Proposed Site Plan’

20-J3128-001.01 Rev.04 ‘Proposed Site Plan (Coloured)’

20-J3128-002 Rev.04 ‘Parking Layout’

20-J3128-003 Rev.02 ‘Building A Floor Plans’

20-J3128-004 Rev.02 ‘Building A Elevations’

20-J3128-005 ‘Building B Floor Plans’

20-J3128-006 ‘Building B Elevations’

20-J3128-007 Rev.01 ‘Building C Floor Plans’

20-J3128-008 Rev.01 ‘Building C Elevations’

20-J3128-009 Rev.02 ‘Street Elevation and Courtyard Sections’

20-J3128-010 Rev.02 ‘Massing Comparison Site Plan & Elevations’

20-J3128-011 ‘Massing Comparison Site Sections – Sheet 1’

20-J3128-012 Rev.01 ‘Massing Comparison Site Sections – Sheet 2’

20-J3128-013 ‘Section Through South Boundary’

20-J3128-015 Rev.03 ‘Cycle Parking’

20-J3128-016 Rev.01 ‘Proposed Amenity’

20-J3128-017 ‘Building A North Elevation (Information Plan)’

2001043-TN-002 Rev B Proposed EVC and Car Club Parking Allocation Layout

REASON: To ensure that the development is carried out only as approved by the Local Planning Authority.

           

5. Prior to commencement of any development above slab level, samples of the external materials to be used in the buildings hereby approved shall be submitted to and approved in writing by the Local Planning Authority. The development shall be constructed in accordance with the approved materials.

REASON: In the interests of the visual amenities of the area.

[Relevant Policies: BFBLP EN20, Core Strategy DPD CS7]

 

6. Prior to commencement of any development above slab level, details showing           the finished floor levels of the buildings hereby approved in relation to a fixed datum point shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details.

REASON: In the interests of the character of the area.

[Relevant Policies: BFBLP EN20, Core Strategy DPD CS7]

 

7. No above slab level works, shall take place until a Sustainability Statement covering water efficiency aimed at achieving an average water use in new dwellings of 110 litres/person/day, has been submitted to, and agreed in writing by, the Local Planning Authority. The development shall be implemented in accordance with the Sustainability Statement, as approved, and retained and maintained as such thereafter.

REASON: In the interests of sustainability and the efficient use of resources.

[Relevant Policy: Core Strategy DPD CS10]

 

8. Prior to commencement of above slab level works an Energy Demand Assessment shall be submitted to and approved in writing by the Local Planning Authority. This shall demonstrate:

 

(a)  that before taking account of any on-site renewable energy production the proposed development will reduce carbon dioxide emissions by at least 10% against the appropriate Target Emission Rate as set out in Part L of the Building Regulations (2006), and

(b)  that a proportion of the development’s energy requirements will be provided from on-site renewable energy production (which proportion shall be at least 20%).

 

The buildings thereafter constructed by the carrying out of the development shall be in accordance with the approved assessment and retained in accordance therewith.

REASON: In the interests of the sustainability and the efficient use of resources.

[Relevant Plans and Policies: CSDPD Policy CS12]

 

9. No development (including initial site-clearance) shall commence until a detailed scheme for the protection of existing trees to be retained, in accordance with British Standard 5837 (2012) 'Trees In Relation To Construction Recommendations' (or any subsequent revision), has been submitted to and approved in writing by the Local Planning Authority. Protection measures shall be phased as necessary to take into account and provide protection during demolition/site clearance works, all construction works and hard landscaping works. Details shall include an approved development layout plan at a minimum scale of 1:200, showing the following:-

 

a) Accurate trunk positions and canopy spreads of all existing trees within the site and on adjoining land adjacent to the development within influencing distance of the development.

b) All proposed tree, hedge or shrub removal shown clearly with a broken line.

c) Proposed location/s of 2.1m high protective barriers, supported by a metal scaffold framework, constructed as a minimum in accordance with Section 6 (Figure 2), to include appropriate weatherproof tree protection area signage (such as "Keep Out - Construction Exclusion Zone") securely fixed to the outside of the protective fencing structure at regular intervals.

d) Illustration/s of the proposed protective barriers to be erected.

e) Proposed location/s and illustration/s of ground protection measures within the main root protection areas of retained trees, designed as necessary for pedestrian light traffic or heavy plant machinery, as necessary to prevent contamination and ground compaction.

f) Annotated minimum distances between protective barriers and trunks of retained trees at regular intervals.

g) All fenced off areas clearly annotated as Tree Protection Areas/Construction Exclusion Zones.

h) Notes regarding restrictions which apply to Tree Protection Areas/Construction Exclusion Zones.

The development shall be carried out in full accordance with the approved scheme.

REASON: In order to safeguard trees and other vegetation.

[Relevant Policies: BFBLP EN1 and EN20, CSDPD CS7]

 

10. The protective fencing and other protection measures specified by condition 9 shall be erected in the locations agreed in writing by the Local Planning Authority prior to the commencement of any development works, including any initial clearance, and shall be maintained fully intact and (in the case of the fencing) upright, in its approved locations at all times, until the completion of all building operations on the site. Where phased protection measures have been approved, no works shall commence on the next phase of the development until the protective fencing barriers and other protective             measures have been repositioned for that phase in full accordance with the approved details. No activity of any description must occur at any time within these areas including but not restricted to the following:

 

a) No mixing of cement or any other materials.

b) Storage or disposal of any soil, building materials, rubble, machinery, fuel, chemicals, liquids waste residues or materials/debris of any other description.

c) Siting of any temporary structures of any description including site

office/sales buildings, temporary car parking facilities, porta-loos, storage compounds or hard standing areas of any other description.

d) Soil/turf stripping, raising/lowering of existing levels, excavation or alterations to the existing surfaces/ ground conditions of any other description.

e) Installation/siting of any underground services, temporary or otherwise including; drainage, water, gas, electricity, telephone, television, external lighting or any associated ducting.

f) Parking/use of tracked or wheeled machinery or vehicles of any description.

 

In addition to the protection measures specified above,

a) No fires shall be lit within 20 metres of the trunks of any trees or the centre line of any hedgerow shown to be retained.

b) No signs, cables, fixtures or fittings of

any other description shall be attached to any part of any retained tree.

 

REASON: In order to safeguard trees and other vegetation considered to be worthy of retention in the interests of the visual amenity of the area.

[Relevant Policies: BFBLP EN1 and EN20, CSDPD CS7]

 

11. No development (other than that required to carry out remediation) shall commence until the approved remediation scheme has been carried out in full accordance with its terms. The Local Planning Authority shall be given two weeks written             notification of commencement of the remediation scheme works.

 

Following completion of measures identified in the approved remediation scheme, and before any occupation of the development hereby permitted, a verification report that demonstrates the effectiveness of the remediation carried out shall be submitted to and             approved in writing by the Local Planning Authority.

REASON: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.

 

12. In the event that contamination is found at any time when carrying out the approved development that was not previously identified all on-site works shall cease,      and the Local Planning Authority shall be informed immediately. Any further investigation/remedial/protective works required by the Local Planning Authority shall be carried out to agreed timescales and approved by the Local Planning Authority in writing before development recommences.

 

Following completion of measures identified in the approved remediation scheme a verification report shall be submitted to and approved in writing by the Local Planning Authority before the re-commencement of on-site works.

REASON: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.

 

13. No development (including demolition and site clearance) shall take place, until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the local planning authority.

The CEMP shall include as a minimum:

(i) Location of the access for demolition and construction vehicles;

(ii) Routing of construction traffic (including directional signage and appropriate traffic management measures);

(iii) Details of the parking of vehicles of site operatives and visitors;

(iv) Areas for loading and unloading of plant and materials;

(v) Areas for the storage of plant and materials used in constructing the development;

(vi) Location of any temporary portacabins and welfare buildings for site operatives;

(vii) Details of any security hoarding;

(viii) Details of any external lighting of the site;

(ix) Details of the method of piling for foundations;

(x) Measures to control the emission of dust, dirt, noise and odour during construction;

(xi) Measures to control rats and other vermin;

(xii) Measures to control surface water run-off during construction;

(xiii) Measures to prevent ground and water pollution from contaminants on-site;

(xiv) construction and demolition working hours and hours during which delivery vehicles or vehicles taking materials away are allowed to enter or leave the site;

(xv) Details of wheel-washing facilities;

(xvi) Measures to minimise, re-use and re-cycle materials and waste arising from demolition;

(xvii) Measures to minimise the pollution potential of unavoidable waste;

(xviii) Measures to dispose of unavoidable waste in an environmentally acceptable manner;

(xix) details of measures to mitigate the impact of demolition and construction activities on ecology; and

(xx) Details of a monitoring regime to demonstrate compliance with the CEMP including timings for reports to be submitted to the Local Planning Authority.

           

The approved Construction Environmental Management Plan shall be adhered to throughout the demolition and construction period.       

REASON: To mitigate and control environmental effects during the demolition and construction phases

Relevant Policies: BFBLP EN20, EN25; Core Strategy DPD CS1, CS7

 

14. No building hereby permitted shall be occupied until a means of vehicular access to the site has been constructed in accordance with the approved plans.

REASON: In the interests of highway safety.

[Relevant Policies: Core Strategy DPD CS23]

 

15. No building hereby permitted shall be occupied until a means of access to it for pedestrians and cyclists has been constructed in accordance with the approved plans.

REASON: In the interests of accessibility and to facilitate access by pedestrians and cyclists.

[Relevant Policies:  BFBLP M6, Core Strategy DPD CS23]

 

16. No building hereby permitted shall be occupied until visibility splays of 2.4m x 43m in each direction at the junction of the access road and Larges Lane have been provided. The land within the visibility splays shall be cleared of any obstruction exceeding 0.6 metres in height measured from the surface of the adjacent carriageway and shall thereafter be kept free of all obstructions to visibility over a height of 0.6 metres measured from the surface of the adjacent carriageway.

REASON: In the interests of highway safety.

[Relevant Policies: Core Strategy DPD CS23]

 

17. No building hereby permitted shall be occupied until 167 car parking spaces have been laid out within the site in accordance with plan reference 20-J3128-002 Rev 04 PARKING LAYOUT. The spaces and turning space shall thereafter be kept available for parking and turning at all times.

REASON: To ensure that the development is provided with adequate car parking to prevent the likelihood of on-street car parking which would be a danger to other road users.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

18. No dwelling shall be occupied until the associated electric vehicle charging infrastructure with a minimum output of 7kW per charge point has been provided in accordance with plan reference 20-J3128-002 Rev 04 PARKING LAYOUT and thereafter the electric vehicle charging infrastructure shall be retained and maintained in working order.

REASON: In the interests of sustainable development and modes of travel.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS1 and CS23]

 

19. There shall be no restrictions on the use of the car parking spaces shown on the approved plan for the occupiers of, or visitors to, the building hereby permitted (other than those parking bays marked as disabled or as EV charging bays which may be restricted for use by people with disabilities or electric vehicle owners respectively).

REASON: To ensure that the development is provided with adequate parking in the interests of highway safety.

[Relevant Policies:  BFBLP M9, Core Strategy DPD CS23]

 

20. The development shall not be occupied until 250 secure and covered cycle parking spaces for residents and 28 cycle parking spaces for visitors have been provided in accordance with details that have been submitted to and approved in writing by the Local Planning Authority, and in the locations identified for cycle parking on the approved plans within the development. The cycle parking facilities shall thereafter be retained.

REASON: In the interests of accessibility of the development to cyclists.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

21. No gates shall be provided at the vehicular accesses to the site.

REASON: In the interests of highway safety.

[Relevant Policies: Core Strategy DPD CS23]

 

22. No building hereby permitted shall be occupied until the following off-site highway works have been completed:

 

The formation of the access to the site and the closure of the access to the cricket club.

Alterations to Larges Lane to form a layby to relocate on street parking opposite the site entrance.

Improved street lighting along the footway adjacent to the site on Larges Lane from the site to its junction with A329 London Road

REASON: In the interests of highway safety.

[Relevant Policies: BFBLP M4, Core Strategy CS24]

 

23. No development shall take place until the applicant or their agents or successors in title have secured the implementation of a programme of archaeological work in accordance with a written scheme of investigation, which has been submitted by the applicant and approved by the Local Planning Authority. The programme of archaeological work shall provide for:

a) a programme of exploratory archaeological evaluation prior to the commencement of development

b) further archaeological investigation prior to the commencement of development of any areas of archaeological interest identified by the exploratory archaeological evaluation

c) post-investigation analysis reporting and publication commensurate with the significance of the archaeological results.

 

This part of the condition may not be discharged until the full programme of archaeological work has been satisfactorily completed. The development shall only take place in accordance with the detailed scheme approved pursuant to this condition.

REASON: The site lies within an area of high archaeological potential. The condition will ensure that any archaeological remains within the site are adequately investigated and recorded in order to advance our understanding of the significance of any buried remains to be lost and in the interest of protecting the archaeological heritage of the Borough.

 

24. No development shall take place until Community Use Agreements prepared in consultation with Sport England have been submitted to and approved in writing by the Local Planning Authority, and a copy of the completed approved agreements have been provided to the Local Planning Authority.  The agreements shall apply to the enhanced          facilities for football detailed in the submitted document Bracknell Town FC & Sandhurst Town FC – an overview of our position by the SB Group and shall include details of pricing policy, hours of use, access by community users, management responsibilities            and a mechanism for review.  The Community Use Agreements shall be retained, and access provided to the facilities in strict compliance with the approved agreements.

Reason: To secure well managed safe community access to the sports facility/facilities, to ensure sufficient benefit to the development of sport and to accord with Development Plan Policy.

 

25. No development shall take place until evidence has been submitted and agreed in writing by the Local Planning Authority that all the works permitted at the Sandhurst Town FC site at Sandhurst Memorial Park, Yorktown Road, Sandhurst under application 19/01085/FUL have been legally and fully completed in accordance with the approved plans.

Reason: To ensure sufficient benefit to the development of sport and to accord with Development Plan Policy.

 

26. The development hereby permitted shall secure Biodiversity Net Gain in line with, or better than, the submitted Biodiversity Net Gain Assessment Report prepared by Applied Ecology (AEL1756_v1.0_20210705).

REASON: In the interests of nature conservation

[Relevant Plans and Policies: Core Strategy DPD CS1, CS7]

 

27. The development hereby permitted shall not be occupied until biodiversity enhancements including swift boxes and other features for wildlife around the site have been provided in accordance with a Biodiversity Enhancement Plan that has been submitted to and approved by the Local Planning Authority.

REASON: In the interests of nature conservation

[Relevant Plans and Policies: Core Strategy DPD CS1, CS7]

 

28. No part of the development shall be occupied until details of a refuse management plan have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be operated in accordance with the approved details.

REASON: To ensure the provision of satisfactory waste storage facilities in the interests of amenity. [Relevant Policy: Relevant Policy: Core Strategy DPD CS13]

 

29. Development of Block A shall not commence until details of the footpath to the north of the block have been submitted to and approved in writing by the Local Planning Authority. The submitted details should include full details of the construction of this pedestrian route including retaining walls or other structures and levels along its length, together with connections with adjoining pedestrian routes within and beyond the site in order to ensure that this route provides an accessible pedestrian link to the cricket club.

REASON: To achieve accessibility and in the interests of the amenities of the area.

 

30. No development shall take place until full details of the Drainage System(s) have been submitted to and approved in writing by the Local Planning Authority. These shall include:

Full details of all components of the proposed drainage system including dimensions, locations, gradients, invert and cover levels, headwall details, planting and drawings as appropriate. This should include confirmation that the construction is in accordance with manufacturer specifications, where necessary.

REASON: To ensure that the site is properly drained and does not increase the risk of flooding in accordance with policy CS1 of the Core Strategy.

 

31. Development shall not commence until a drainage strategy detailing any on- and off-site drainage works, along with proposed points of connection, has been submitted to and approved by the Local Planning Authority in consultation with the sewerage undertaker.

REASON: To ensure that the site is properly drained and does not increase the risk of flooding in accordance with policy CS1 of the Core Strategy.

 

32. No development shall commence until details of how the surface water drainage shall be maintained and managed after completion have been submitted to and approved in writing by the Local Planning Authority.   The details shall include confirmation of the required maintenance activities with expected frequency, with site specific assessments included to demonstrate that health and safety has been fully considered in the design and that access and egress for future residents will be maintained during any operations to repair or replace drainage features.

REASON: To ensure that the site is properly drained and does not increase the risk of flooding In accordance with policy CS1 of the Core Strategy.

 

33. No building or use herby permitted shall be occupied or the use commenced until the sustainable urban drainage scheme for this site has been completed in accordance with the submitted details. The sustainable urban drainage scheme shall be managed and maintained thereafter in accordance with the agreed management and maintenance plan. Written confirmation of agreements for the management and maintenance of the drainage scheme shall be submitted and approved by the local planning authority.

REASON: To ensure that the site is properly drained and does not increase the risk of flooding In accordance with policy CS1 of the Core Strategy.

 

34. Prior to practical completion of any property a verification report, appended with substantiating evidence demonstrating the agreed/approved construction details and specifications have been implemented, will need to be submitted and approved (in writing) by the Council. This will include photos of excavations and soil profiles/horizons, any placement of tanking, crating, connecting pipe work, hydrobrakes or control mechanisms, cover systems etc.

REASON: To ensure that the site is properly drained and does not increase the risk of flooding in accordance with policy CS1 of the Core Strategy.

 

Supporting documents: