Agenda item

18/00827/FUL Sunnymead, Jocks Lane, Bracknell, Berkshire RG42 1SU

Erection of 3no. dwellinghouses and one chalet bungalow, revised access, on-site car parking, private amenity space and landscaping following demolition of existing dwelling and associated garage.

Minutes:

Erection of 3no. dwelling houses and one chalet bungalow, revised access, on-site car parking, private amenity space and landscaping following demolition of existing dwelling and associated garage.

 

A site visit had been held on Saturday, 8 December 2018, which had been attended by Councillors Angell, Brossard, Dudley, Heydon, Mrs Ingham, Mrs Mattick and Mrs McKenzie Boyle.

 

The Committee noted:

 

  • The comments of Bracknell Town Council.
  • Six letters of objection to the application received from local residents, as summarised in the Agenda papers.

 

RESOLVED that following the completion of planning obligation(s) under Section 106of the Town and Country Planning Act 1990 relating to:-

 

- Measures to avoid and mitigate the impact of residential development upon the Thames Basin Heaths Special Protection Area (SPA).

 

the Head of Planning be authorised to APPROVE the application subject to the following conditions amended, added to or deleted as the Head of Planning considers necessary:-

 

01. The development hereby permitted shall be begun before the expiration of three years from the date of this permission.                             

REASON:  To comply with Section 91 of the Town and Country Planning Act 1990

 

02. The development hereby permitted shall be carried out only in accordance with the following approved plans received by the Local Planning Authority on 16 August 2018 and 5 October 2018:

 

PI2/01/B, PI2/02/A, PI2/03, PI2/04 PI2/05/A, PI2/06, PI2/07

 

REASON: To ensure that the development is carried out only as approved by the Local Planning Authority.

 

03. No superstructure works shall take place until brick and tile samples to be used in the construction of the external surfaces of the dwelling hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details.

REASON: In the interests of the visual amenities of the area.

[Relevant Policies: BFBLP EN20, Core Strategy DPD CS7]

 

04. No construction works shall take place until details showing the finished floor levels of the dwelling hereby approved in relation to a fixed datum point have been submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in accordance with the approved details.

REASON: In the interests of the character of the area.

[Relevant Policies: BFBLP EN20, Core Strategy DPD CS7]

 

05. No construction works shall take place until details of a scheme of walls, fences and any other means of enclosure has been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented in full before the occupation of the building approved in this permission.

REASON: In the interests of the visual amenities of the area.

[Relevant Plans and Policies: BFBLP EN20, Core Strategy DPD CS7]

 

06. No construction works shall commence until a scheme depicting hard and soft landscaping has been submitted to and approved in writing by the Local Planning Authority. The scheme shall include a 3 year post planting maintenance schedule.

All planting comprised in the soft landscaping works shall be carried out and completed in full accordance with the approved scheme, in the nearest planting season (1st October to 31st March inclusive) to the completion of the development or prior to the occupation of any part of the approved development, whichever is sooner.  All hard landscaping works shall be carried and completed prior to the occupation of any part of the approved development. As a minimum, the quality of all hard and soft landscape works shall be carried out in accordance with British Standard 4428:1989 'Code Of practice For General Landscape Operations' or any subsequent revision. All trees and other plants included within the approved details shall be healthy, well formed specimens of a minimum quality that is compatible with British Standard 3936:1992 (Part 1) 'Specifications For Trees & Shrubs' and British Standard 4043 (where applicable) or any subsequent revision.  Any trees or other plants which within a period of 5 years from the completion of the development, die, are removed, uprooted, are significantly damaged, become diseased or deformed, shall be replaced during the nearest planting season (1st October to 31st March inclusive) with others of the same size, species and quality as approved.

REASON: In the interests of good landscape design and the visual amenity of the area.

[Relevant Policies: BFBLP EN20, CSDPD CS7]

 

07. The first floor bathroom window in the east facing side elevation of Unit 1 hereby permitted shall not be glazed at any time other than with a minimum of Pilkington Level 3 obscure glass (or equivalent).  They shall at all times be fixed shut to a height not less than 1.7m above internal floor level.

REASON: To prevent the overlooking of neighbouring properties.

[Relevant Policies: BFBLP EN20]

 

08. The first floor dormer windows in the east facing side elevations of Units 2 and 3 and the west facing side elevation of Unit 4 hereby permitted shall not be glazed at any time other than with a minimum of Pilkington Level 3 obscure glass (or equivalent).  They shall at all times be fixed shut to a height not less than 1.7m above internal floor level.

REASON: To prevent the overlooking of neighbouring properties.

[Relevant Policies: BFBLP EN20]

 

09. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (or any Order revoking and re-enacting that Order with or without modification) no additional windows, similar openings or enlargement thereof shall be constructed at first floor level or above in west or east facing side elevations of the dwellings hereby permitted except for any which may be shown on the approved drawings.

REASON: To prevent the overlooking of neighbouring properties.

[Relevant Policies: BFBLP EN20]

 

10. No dwelling shall be occupied until a means of vehicular access has been constructed in accordance details which have been submitted to and approved in writing by the Local Planning Authority. 

REASON: In the interests of highway safety.

[Relevant Policies: Core Strategy DPD CS23]

 

11. No dwelling shall be occupied until the vehicle parking and turning space for the new dwellings has been set out in accordance with the approved drawing. The spaces shall be retained as such thereafter and shall not be used for any purpose other than parking and turning.

REASON: To ensure that the development is provided with adequate car parking to prevent the likelihood of on-street car parking which would be a danger to other road users.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

12. No dwelling shall be occupied until secure and covered parking for bicycles and storage for refuse has been provided in accordance with the approved drawings. It shall be retained as such thereafter.

REASON: In order to ensure bicycle facilities and refuse storage are provided.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

13. No gates shall be provided at the vehicular access to the site.

REASON: In the interests of highway safety.

[Relevant Policies: Core Strategy DPD CS23]

 

14. No dwelling shall be occupied until a scheme has been submitted to and approved in writing by the Local Planning Authority for off-site highway works including a new footway or lane widening to the front of the site. The dwellings provided by the carrying out of the development shall not be occupied until the off-site highway works have been completed in accordance with the scheme. The development shall be carried out in accordance with the approved details.

REASON: In the interests of highway safety.

[Relevant Policy: CSDPD CS23]

 

15. The development hereby permitted shall not be begun until a scheme has been submitted to and approved in writing by the Local Planning Authority, to accommodate:

(a) Parking of vehicles of site personnel, operatives and visitors

(b) Loading and unloading of plant and vehicles

(c) Storage of plant and materials used in constructing the development

(d) Wheel cleaning facilities

(e) Temporary portacabins and welfare for site operatives

and each facility shall be retained throughout the course of construction of the development, free from any impediment to its designated use.  No other areas on the site, other than those in the approved scheme shall be used for the purposes listed (a) to (e) above.

REASON: In the interests of highway safety.

[Relevant Policies: Core Strategy DPD CS23]

 

16. The development hereby permitted shall be carried out in accordance with the tree protection measures as set out on plan 9435-KC-XX-YTREE-TPP02REVD received by the Local Planning Authority on 10 October 2018.

REASON: In order to safeguard trees and other vegetation considered to be worthy of retention in the interests of the visual amenity of the area.

[Relevant Policies: BFBLP EN1 and EN20, CSDPD CS7]

 

17. The development hereby permitted shall be carried out in accordance with the mitigation measures contained in Calyx Environmental Ltd ‘Preliminary Ecological Appraisal and Bat Survey Report’ dated July 2017 (reference FHS17001).

REASON: In the interests of nature conservation.

[Relevant Policies Core Strategy CS1, CS7]

 

18. The demolition of any buildings on site shall not commence unless the Local Planning Authority has been provided with either:

a) a Licence issued by Natural England pursuant to Regulation 53 of The Conservation of Habitats and Species Regulations 2010 authorising the specified activity to go ahead; or

b) a statement in writing from the relevant licensing body to the effect that it does not consider that the specified activity will require a Licence.

REASON: In the interests of nature conservation

[Relevant Plans and Policies: CSDPD CS1, CS7]

 

19. No dwelling shall be occupied until a Sustainability Statement covering water efficiency aimed at achieving an average water use in new dwellings of 110 litres/person/day, has been submitted to, and agreed in writing by, the Local Planning Authority. The development shall be implemented in accordance with the Sustainability Statement, as approved, and retained as such thereafter.

REASON: In the interests of sustainability and the efficient use of resources.

[Relevant Policy: Core Strategy DPD CS10]

 

20. No construction works shall take place until an Energy Demand Assessment demonstrating that at least 10% of the development's energy requirements will be provided from on-site renewable energy production, has been submitted to and approved in writing by the Local Planning Authority. The dwellings as constructed by the carrying out of the development shall be in accordance with the approved assessment and retained in accordance therewith.

REASON: In the interests of the sustainability and the efficient use of resources.

[Relevant Plans and Policies: CSDPD Policy CS12]

 

21. The development shall incorporate surface water drainage that is SuDS compliant and in accordance with DEFRA "Sustainable Drainage Systems - Non-statutory technical standards for sustainable drainage systems" (March 2015).  It shall be operated and maintained as such thereafter. 

REASON: To prevent increased risk of flooding, to improve and protect water quality and ensure future maintenance of the surface water drainage scheme.

[Relevant Policies: CSDPD CS1, BFBLP EN25]

 

In the event of the S106 agreement not being completed by 31 March 2019, the Head of Planning be authorised to either extend the period further or refuse the application on the grounds of:

 

01. The occupants of the development would put extra pressure on the Thames Basin Heaths Special Protection Area and the proposal would not satisfactorily mitigate its impacts in this respect. In the absence of a planning obligation to secure suitable avoidance and mitigation measures and access management monitoring arrangements, in terms that are satisfactory to the Local Planning Authority, the proposal would be contrary to Policy NRM6 of the South East Plan, Policy EN3 of the Bracknell Forest Borough Local Plan, Policy CS14 of the Core Strategy Development Plan Document and the Thames Basin Heaths Special Protection Area Supplementary Planning Document (2018).

Supporting documents:

 

Contact Information

Democratic services

Email: committee@bracknell-forest.gov.uk