Agenda item

PS Application 15/00888/FUL Green Acres, Warfield Road

The erection of 8 new dwellings with associated garages and parking with the access off existing bell mouth on Atte Lane following demolition of existing outbuilding.

Minutes:

The erection of 8 new dwellings with associated garages and parking with the access off existing bell mouth on Atte Lane following demolition of existing outbuilding.

 

A site visit had been held on Saturday 12 December 2015 which had been attended by Councillors Brossard, Dudley, Hill, Mrs Ingham, Mrs McKenzie-Boyle, Peacey and Thompson.

 

The Committee noted:

·         The comments of Warfield Parish Council, raising a number of concerns.

·         Objections were received from 15 households for the original plans. An additional seven letters, from the same households, were received for the revised plans. The issues raised are summarised below:

-       Consultation was not carried out appropriately

-       Maintenance of existing planting

-       Insufficient car parking

-       Concerns that Atte Lane will be used for overspill parking, which would result in congestion and highway safety issues.

-       Congestion on Atte Lane and associated noise and disturbance.

-       Access should be from Warfield Road.

-       Road safety of Atte Lane and surrounding roads.

-       Insufficient visitor parking.

-       Concerns over construction vehicles, dust carts, delivery vehicles, fire engines and ambulances being able to access the site.

-       Overdevelopment of the site.

-       The terraced houses do not have garages and are out of keeping with the surrounding houses.

-       Removal of hedging would affect the character of Atte Lane.

-       There should be replacement planting and landscaping to ensure character and privacy are maintained.

-       The other side of the site is more appropriate for redevelopment.

-       Noise and disturbance to surrounding properties from additional houses.

-       Biodiversity concerns.

-       Security risk and health and safety risk from pathway to the rear of the houses for bin storage.

-       Sets a precedent for high density development on eastern part of Green Acres site.

-       No school places.

-       The design and size of the houses is out of character with the surrounding development.

 

It was RESOLVED that following the completion of planning obligation(s) under Section 106 of the Town and Country Planning Act 1990 relating to measures to avoid and mitigate the impact of residential development upon the Thames Basins Heath Special Protection Area (SPA);

That the Head of Planning be authorised to APPROVE the application subject to the following condition(s):-

 

01.  The development hereby permitted shall be begun before the expiration of three years from the date of this permission.                  

REASON:  To comply with Section 91 of the Town and Country Planning Act 1990.

 

02.  The development hereby permitted shall be carried out only in accordance with the

following approved plans and documents received by the Local Planning Authority on

9 November 2015:      

 

P15/32/101/E: Proposed site layout

P15/32/110/D: Plots 1-3 Floor Plans

P15/32/120/A: Plots 1-6 Elevations sheet 1 of 2

P15/32/121/A: Plots 1-6 Elevations sheet 2 of 2

P15/32/210/C: Plot 7 Plans and Elevations

P15/32/310/A: Plot 8 Plans and Elevations

REASON: To ensure that the development is carried out only as approved by the Local Planning Authority.

 

03.  No development shall take place until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority.  The development shall be carried out in accordance with the approved details.

REASON: In the interests of the visual amenities of the area.

[Relevant Policies: BFBLP EN20, Core Strategy DPD CS7]

 

04.  The proposed bathroom windows in the northern (rear) elevations of the dwellings on plots 2 and 5 hereby permitted shall not be glazed at any time other than with a minimum of Pilkington Level 3 obscure glass (or equivalent). 

REASON: To prevent the overlooking of neighbouring properties.

[Relevant Policies: BFBLP EN20]

 

05.  Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any Order revoking and re-enacting that Order with or without modification) no additional windows, similar openings or enlargement thereof shall be constructed in the first floor of the houses hereby permitted except for any which may be shown on the approved drawing(s).

REASON: To prevent the overlooking of neighbouring property.

[Relevant Policies: BFBLP EN20]

 

06.  No site clearance shall take place during the main bird-nesting period of 1st March to 31st August inclusive.

REASON: In the interests of nature conservation

[Relevant Plans and Policies: BFBLP EN3 CS1, CS7]

 

07.  The demolition shall not be begun until a scheme for the provision of bird and bat boxes (and other biodiversity enhancements), including a plan or drawing showing the location of these enhancements, has been submitted to and approved in writing by the local planning authority.

The approved scheme shall be implemented and maintained.

REASON: In the interests of nature conservation

[Relevant Plans and Policies: CSDPD CS1, CS7]

 

08.  The development hereby permitted (including initial site-clearance) shall not be begun until a detailed scheme, and programme for its implementation for the protection of existing trees in accordance with British Standard 5837:2012 ‘Trees In Relation To Construction Recommendations’ (or any subsequent revision), has been submitted to and approved in writing by the Local Planning Authority.  The submitted scheme shall include proposals for the phasing of its implementation so that protection is provided from the commencement of demolition or site clearance works (whichever is the sooner), through to the construction works and the completion of hard landscaping works.  The submitted scheme shall include the following:

 

a)    Accurate trunk positions and canopy spreads of all existing trees

b)    Minimum ‘Root Protection Areas’ of all existing trees

c)    Plans of a minimum scale of 1:200 showing the proposed locations of protective barrier/s, constructed in accordance with Section 6 (Figures 2 or 3) of BS 5837:2012, to include appropriate weatherproof tree protection area signage (such  as “Keep Out - Construction Exclusion Zone”) securely fixed to the outside of the protective fencing structure at regular intervals.

d)    Proposed ground protection measures in accordance with Section 6 (Figure 3) of BS 5837:2012.

e)    Annotated minimum distances between fencing and trunks of retained trees at regular intervals.

f)     Illustration/s of the proposed fencing structure/s to be erected.

 

The development shall be carried out in accordance with the approved scheme and programme.

REASON: In order to safeguard trees and other vegetation considered to be worthy of retention in the interests of the visual amenity of the area.

[Relevant Policies: BFBLP EN1 and EN20, CSDPD CS7]

 

09.  The protective fencing and other protection measures specified by condition 8 shall be erected in the locations agreed in writing by the Local Planning Authority prior to the commencement of any development works, including any initial clearance, and shall be maintained fully intact and (in the case of the fencing) upright, in its approved locations at all times, until the completion of all building operations on the site. Where phased protection measures have been approved, no works shall commence on the next phase of the development until the protective fencing barriers and other protective measures have been repositioned for that phase in full accordance with the approved details. No activity of any description must occur at any time within these areas including but not restricted to the following: -

 

a)    No mixing of cement or any other materials.

b)    Storage or disposal of any soil, building materials, rubble, machinery, fuel, chemicals, liquids waste residues or materials/debris of any other description.

c)    Siting of any temporary structures of any description including site office/sales buildings, temporary car parking facilities, porta-loos, storage compounds or hard standing areas of any other description.

d)    Soil/turf stripping, raising/lowering of existing levels, excavation or alterations to the existing surfaces/ ground conditions of any other description.

e)    Installation/siting of any underground services, temporary or otherwise including; drainage, water, gas, electricity, telephone, television, external lighting or any associated ducting.

f)     Parking/use of tracked or wheeled machinery or vehicles of any description.

 

In addition to the protection measures specified above, 

 

a)    No fires shall be lit within 20 metres of the trunks of any trees or the centre line of any hedgerow shown to be retained.

b)    No signs, cables, fixtures or fittings of any other description shall be attached to any part of any retained tree.

 

REASON: - In order to safeguard trees and other vegetation considered to be worthy of retention in the interests of the visual amenity of the area.

 

10.  The development hereby permitted shall not be begun until details of a scheme of walls, fences and any other means of enclosure has been submitted to and approved in writing by the Local Planning Authority.  The approved scheme shall be implemented in full before the occupation of any of the dwellings approved in this permission.

REASON: - In the interests of the visual amenities of the area and to safeguard existing retained trees, hedges and shrubs.

[Relevant Plans and Policies: BFBLP EN20, Core Strategy DPD CS7]

 

11.  No development shall take place until comprehensive details of both hard and soft landscaping works have been submitted to and approved in writing by the Local Planning Authority.  These details shall include: -

 

a)    Comprehensive planting plans of an appropriate scale and level of detail that provides adequate clarity including details of ground preparation and all other operations associated with plant and grass establishment, full schedules of plants, noting species, and detailed plant sizes/root stock specifications, planting layout, proposed numbers/densities locations.

b)    Details of semi mature tree planting.

c)    Comprehensive 5 year post planting maintenance schedule.

d)    Underground service and external lighting layout (drainage, power, communications cables, pipelines etc. indicating lines, manholes etc.), both existing reused and proposed new routes.

 

All planting comprised in the soft landscaping works shall be carried out and completed in full accordance with the approved scheme, in the nearest planting season (1st October to 31st March inclusive) to the completion of the development or prior to the occupation of any part of the approved development, whichever is sooner.  All hard landscaping works shall be carried and completed prior to the occupation of any part of the approved development. As a minimum, the quality of all hard and soft landscape works shall be carried out in accordance with British Standard 4428:1989 ‘Code Of practice For General Landscape Operations’ or any subsequent revision. All trees and other plants included within the approved details shall be healthy, well formed specimens of a minimum quality that is compatible with British Standard 3936:1992 (Part 1) ‘Specifications For Trees & Shrubs’ and British Standard 4043 (where applicable) or any subsequent revision.  Any trees or other plants which within a period of 5 years from the completion of the development, die, are removed, uprooted, are significantly damaged, become diseased or deformed, shall be replaced during the nearest planting season (1st October to 31st March inclusive) with others of the same size, species and quality as approved.

 

REASON: - In the interests of good landscape design and the visual amenity of the area.

 

12.  No demolition or construction work shall take place outside the hours of 8:00 am and 6:00 pm Monday to Friday; 8:00 am and 1:00 pm Saturday and not at all on Sundays and Public Holidays.

REASON: In the interests of the amenities of the area.

[Relevant Policies: BFBLP EN25]

 

13.  During the demolition and construction phases, no deliveries shall be taken at or dispatched from the site outside the hours of 8:00 am and 6:00 pm Monday to Friday; 8:00 am and 1:00 pm Saturday and not at all on Sundays and Public Holidays.

REASON: In the interests of the amenities of the occupiers of nearby residential premises.

[Relevant Policies: BFBLP EN25]

 

14.  No dwelling shall be occupied until vehicular access as shown on drawing P15/32/101-D has been constructed.

REASON: In the interests of highway safety.

[Relevant Policies: Core Strategy DPD CS23]

 

15.  The dwellings shall not be occupied until visibility splays of 2.0 metres by 2.0 metres have been provided at the junction of the driveway and the adjacent carriageway.  The dimensions shall be measured along the edge of the drive and the edge of the carriageway from their point of intersection.  The visibility splays shall at all times thereafter be kept free of all obstructions to visibility over a height of 0.6 metres measured from the surface of the carriageway.

REASON: In the interests of highway safety.

[Relevant Policies: Core Strategy DPD CS23]

 

16.  No dwelling shall be occupied until the associated vehicle parking and turning space has been surfaced and marked out in accordance with drawing P15/32/101-D. The spaces shall thereafter be kept available for parking at all times.

REASON: To ensure that the development is provided with adequate car parking to prevent the likelihood of on-street car parking which would be a danger to other road users.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

17.  No dwelling shall be occupied until a scheme has been submitted to and approved in writing by the Local Planning Authority for cycle parking facilities.   The dwellings shall not be occupied until the approved scheme has been implemented.  The facilities shall be retained.

REASON: In the interests of accessibility of the development to cyclists.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

18.  The garage accommodation shall be retained for the use of the parking of vehicles at all times.

REASON: To ensure that the Local Planning Authority’s vehicle parking standards are met.

[Relevant Policy: BFBLP M9]

 

19.  The development hereby permitted shall not be begun until a scheme has been submitted to and approved in writing by the Local Planning Authority, to accommodate:

 

a)    Parking of vehicles of site personnel, operatives and visitors

b)    Loading and unloading of plant and vehicles

c)    Storage of plant and materials used in constructing the development

d)    Wheel cleaning facilities

e)    Temporary portacabins and welfare for site operatives

 

and each facility shall be retained throughout the course of construction of the development, free from any impediment to its designated use.  No other areas on the site, other than those in the approved scheme shall be used for the purposes listed (a) to (e) above.

 

REASON: In the interests of amenity and road safety.

 

20.  The development shall not be begun until a Sustainability Statement covering water efficiency aimed at achieving an average water use in new dwellings of 110 litres/person/day, has been submitted to, and agreed in writing by, the Local Planning Authority. The development shall be implemented in accordance with the Sustainability Statement, as approved, and retained as such thereafter.

REASON: In the interests of sustainability and the efficient use of resources.

[Relevant Policy: Core Strategy DPD CS10]

 

21.  The development shall not be begun until an Energy Demand Assessment has

been submitted to and approved in writing by the Local Planning Authority. This shall demonstrate that carbon emission will be reduced by at least 10% and that a proportion of the development's energy requirements will be provided from on-site renewable energy production (which proportion shall be 20%).  The buildings thereafter constructed by the carrying out of the development shall be in accordance with the approved assessment and retained in accordance therewith.

REASON: In the interests of the sustainability and the efficient use of resources.

[Relevant Plans and Policies: CSDPD Policy CS12]

 

22.  The development shall incorporate surface water drainage that is SuDS compliant and in accordance with DEFRA "Sustainable Drainage Systems - Non-statutory technical standards for sustainable drainage systems" (March 2015).  It shall be operated and maintained as such thereafter. 

REASON: To prevent increased risk of flooding, to improve and protect water quality and ensure future maintenance of the surface water drainage scheme.

[Relevant Policies: CSDPD CS1, BFBLP EN25]

 

 

 

In the event of the S106 agreement not being completed by 25 March 2016, the Head of Planning be authorised to extend this period or refuse the application on the grounds of:

 

The occupants of the development would put extra pressure on the Thames Basin Heaths Special Protection Area and the proposal would not satisfactorily mitigate its impacts in this respect.  In the absence of a planning obligation to secure suitable avoidance and mitigation measures and access management monitoring arrangements, in terms that are satisfactory to the Local Planning Authority, the proposal would be contrary to Policy NRM6 of the South East Plan, Policy EN3 of the Bracknell Forest Borough Local Plan, Policy CS14 of the Core Strategy Development Plan Document and the Thames Basin Heaths Special Protection Area Avoidance and Mitigation Supplementary Planning Document (2012).

Supporting documents: